{"id":34539,"date":"2026-03-04T15:19:12","date_gmt":"2026-03-04T23:19:12","guid":{"rendered":"https:\/\/essential.construction\/news\/voyas-north-tower-tops-off-in-mississauga-city-centre\/"},"modified":"2026-03-04T15:19:12","modified_gmt":"2026-03-04T23:19:12","slug":"voyas-north-tower-tops-off-in-mississauga-city-centre","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/voyas-north-tower-tops-off-in-mississauga-city-centre\/","title":{"rendered":"Voya\u2019s North Tower Tops Off in Mississauga City Centre"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Forming is drawing to a close at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/voya.45473\" target=\"_blank\">Voya<\/a> in Mississauga City Centre, where the north tower has now topped out, and the south tower is nearing the same milestone. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/turner-fleischer-architects.8071\" target=\"_blank\">Turner Fleischer Architects<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/amacon.7634\" target=\"_blank\">Amacon<\/a>, the 38- and 44-storey high-rises form part of the developer\u2019s <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/parkside-village.58837\" target=\"_blank\">Parkside Village<\/a> community, west of Square One. They rise immediately beside Amacon&#8217;s completed <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/parkside-village-avia-1-2.43527\" target=\"_blank\">Avia 1 and 2<\/a> towers delivered last year.\u00a0<\/p>\n<p dir=\"ltr\">In November, 2025, the north tower, in the background, has topped out at 38 storeys in this view, while the south tower has climbed to roughly 43 storeys with its uppermost residential floor-plates still exposed and perimeter protection in place. The curving balcony slab edges are legible along both towers. On the northeast elevations, installation of the white slab-edge panels and dark window-wall glazing has advanced to approximately the 24th floor on the north tower and into the 25th floor on the south tower. A completed Avia tower rises at centre.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194777.jpg\" data-entity-uuid=\"insert-display_default-78209d31-0419-451f-b46d-14dd280022cb\" data-entity-type=\"file\" alt=\"Voya, Mississauga, designed by Turner Fleischer Architects for Amacon\" title=\"Looking northwest to cladding progress for both towers, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194777.jpg', true, 'Looking northwest to cladding progress for both towers, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking northwest to cladding progress for both towers, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">One month later from a greater distance, the north tower is fully formed through its mechanical penthouse, identifiable by the heavier roof slab and enclosed rooftop volume. To the right, the south tower continues to advance, with formwork in place at approximately the 44th floor. A white concrete boom pump extends to the top level, while the external construction hoist climbs the southeast corner. Below, dark window-wall glazing is installed to roughly the 33rd floor of both towers.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194774.jpg\" data-entity-uuid=\"insert-display_default-93a0c3ee-4450-4fa8-b6f2-8e3399153538\" data-entity-type=\"file\" alt=\"Voya, Mississauga, designed by Turner Fleischer Architects for Amacon\" title=\"Looking northwest to the north tower's mechanical penthouse formation and south tower's upper-level formwork, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194774.jpg', true, 'Looking northwest to the north tower\\'s mechanical penthouse formation and south tower\\'s upper-level formwork, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking northwest to the north tower&#8217;s mechanical penthouse formation and south tower&#8217;s upper-level formwork, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">A zoomed view highlights the fluid slab edges that distinguishes Voya\u2019s architecture, where the stepped podium transitions into the twin towers through a series of undulating floor-plates, reinforced by newly installed white-painted balcony guards wrapping the terraces to approximately the 17th floor on both towers. The uppermost podium terrace awaits balconyguard installation. Behind the balconies, dark window-wall glazing fills in the residential bays.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194773.jpg\" data-entity-uuid=\"insert-display_default-06bddf73-7083-47aa-94d0-82bcdea91eab\" data-entity-type=\"file\" alt=\"Voya, Mississauga, designed by Turner Fleischer Architects for Amacon\" title=\"Close-up of Voya\u2019s undulating podium and lower tower balcony installation, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194773.jpg', true, 'Close-up of Voya\u2019s undulating podium and lower tower balcony installation, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Close-up of Voya\u2019s undulating podium and lower tower balcony installation, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">In February, 2026, the north tower\u2019s crane is now removed and its mechanical penthouse clad in alternating panels, while the rooftop slab above remains exposed concrete. The south tower has reached its uppermost suite level, with grey tarping protecting the recently poured 44th floor as work transitions to forming its mechanical penthouse. Dark window-wall glazing now spans the full height of the north tower and rises to roughly the 37th floor on the south tower. White balcony guardrails are installed to approximately the 26th floor on the north tower and the 25th on the south, with intermittent levels still awaiting guard installation. Below, the stepped podium\u2019s rooftop terrace is clearly defined, though sections of the uppermost slab edge remain without cladding.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194775.jpg\" data-entity-uuid=\"insert-display_default-f3cf96ae-9588-46a7-bba0-157313b7023e\" data-entity-type=\"file\" alt=\"Voya, Mississauga, designed by Turner Fleischer Architects for Amacon\" title=\"Looking northeast to the remaining tower crane atop the south tower, image by UrbanToronto Forum contributor Lake Ontario\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194775.jpg', true, 'Looking northeast to the remaining tower crane atop the south tower, image by UrbanToronto Forum contributor Lake Ontario'); return false;\"><span class=\"image-description\">Looking northeast to the remaining tower crane atop the south tower, image by UrbanToronto Forum contributor Lake Ontario<\/span><\/p>\n<p dir=\"ltr\">Seen at night from Zonta Meadows Park, the construction hoist remains attached along the north elevation of the north tower. On the south tower, enclosure has progressed to roughly the 37th floor along this elevation.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194776.jpg\" data-entity-uuid=\"insert-display_default-5e039dd9-c63f-486e-80e2-4843e75e9306\" data-entity-type=\"file\" alt=\"Voya, Mississauga, designed by Turner Fleischer Architects for Amacon\" title=\"Looking southeast to the north tower's illuminated mechanical penthouse and shared podium base, image by UrbanToronto Forum contributor ThatSlickCat\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194776.jpg', true, 'Looking southeast to the north tower\\'s illuminated mechanical penthouse and shared podium base, image by UrbanToronto Forum contributor ThatSlickCat'); return false;\"><span class=\"image-description\">Looking southeast to the north tower&#8217;s illuminated mechanical penthouse and shared podium base, image by UrbanToronto Forum contributor ThatSlickCat<\/span><\/p>\n<p dir=\"ltr\">Upon completion, Voya will deliver 960 condominium units and 22 affordable rental units.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194772.jpeg\" data-entity-uuid=\"insert-display_default-4f85eec8-72df-4f05-aaa4-0e94570f4e6f\" data-entity-type=\"file\" alt=\"Voya, Mississauga, designed by Turner Fleischer Architects for Amacon\" title=\"Looking north to Voya, designed by Turner Fleischer Architects for Amacon\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/03\/60505\/60505-194772.jpeg', true, 'Looking north to Voya, designed by Turner Fleischer Architects for Amacon'); return false;\"><span class=\"image-description\">Looking north to Voya, designed by Turner Fleischer Architects for Amacon<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on these developments, but in the meantime, you can learn more about them from our Database files, linked below. If you&#8217;d like, you can join in on the conversations in the associated Project Forum threads or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/03\/voyas-north-tower-tops-mississauga-city-centre.60505\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Forming is drawing to a close at Voya in Mississauga City Centre, where the north tower has now topped &#8230; <a title=\"Voya\u2019s North Tower Tops Off in Mississauga City Centre\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/voyas-north-tower-tops-off-in-mississauga-city-centre\/\" aria-label=\"Read more about Voya\u2019s North Tower Tops Off in Mississauga City Centre\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-34539","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34539"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34539\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}