{"id":34567,"date":"2026-03-06T15:17:15","date_gmt":"2026-03-06T23:17:15","guid":{"rendered":"https:\/\/essential.construction\/news\/mtx-wins-33m-welsh-modular-hospital-revamp\/"},"modified":"2026-03-06T15:17:15","modified_gmt":"2026-03-06T23:17:15","slug":"mtx-wins-33m-welsh-modular-hospital-revamp","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/mtx-wins-33m-welsh-modular-hospital-revamp\/","title":{"rendered":"MTX wins \u00a333m Welsh modular hospital revamp"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The main design and build contract awarded by the Betsi Cadwaladr University Health Board for the three-storey 2,500m\u00b2 facility will see MTX employ advanced elements of Modern Methods of Construction<\/p>\n<p>MTX has led the scheme through a two-stage procurement process under a Pre-Construction Service Agreement (PCSA), working closely with NHS Wales Shared Services Partnership (NWSSP) to develop a fully compliant design to RIBA Stage 4.<\/p>\n<p>MTX has also worked closely with the health board through several carefully planned end-user sessions designed to engage the various departments within the new building.<\/p>\n<p>Precisely engineered steel structural units will be used to create the fabric of the building, factory-manufactured offsite while groundworks are underway to streamline the overall construction process.<\/p>\n<p>Once the foundations and site preparations are complete, the prefabricated modules will be transported to site, craned into position and made watertight, to allow pouring of concrete floors, internal fit-out and installation of mechanical and electrical services to progress rapidly.<\/p>\n<p>Work is due to start on site in the next few weeks and is scheduled to be completed in 2027.<\/p>\n<p>The project represents the first phase of a \u00a360m investment in the Royal Alexandra Hospital. The business case for phase two to redevelop and improve the existing hospital will be submitted separately by Betsi Cadwaladr University Health Board.<\/p>\n<p>MTX Contracts Ltd Managing Director David Hartley said: \u201cBeing chosen to partner with the health board in the creation of this important healthcare project reflects our strong track record in providing high-quality healthcare facilities across the UK.<\/p>\n<p>\u201cBy employing hybrid methods of construction and our own unique skillset, we\u2019re looking forward to delivering this vital new facility quickly, sustainably and cost-effectively, all whilst minimising disruption to existing patient pathways.\u201d<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/03\/06\/mtx-wins-33m-welsh-modular-hospital-revamp\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The main design and build contract awarded by the Betsi Cadwaladr University Health Board for the three-storey 2,500m\u00b2 facility &#8230; <a title=\"MTX wins \u00a333m Welsh modular hospital revamp\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/mtx-wins-33m-welsh-modular-hospital-revamp\/\" aria-label=\"Read more about MTX wins \u00a333m Welsh modular hospital revamp\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34567","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34567"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34567\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}