{"id":34691,"date":"2026-03-16T16:38:38","date_gmt":"2026-03-16T23:38:38","guid":{"rendered":"https:\/\/essential.construction\/news\/robertson-uses-blow-up-roof-to-keep-hospital-dry\/"},"modified":"2026-03-16T16:38:38","modified_gmt":"2026-03-16T23:38:38","slug":"robertson-uses-blow-up-roof-to-keep-hospital-dry","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/robertson-uses-blow-up-roof-to-keep-hospital-dry\/","title":{"rendered":"Robertson uses blow-up roof to keep hospital dry"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The inflatable tents have been installed as part of the RAAC replacement programme on the roof of Royal Bolton Hospital\u2019s maternity unit.<\/p>\n<p>Robertson Construction North West has adapted the air-filled structures to sit on scaffolding at roof level. This creates a sealed weatherproof working area while crews remove reinforced autoclaved aerated concrete and install new mechanical and electrical systems.<\/p>\n<p>The 35m-long inflatable structures inflate in around seven minutes and can be packed away in just three, allowing teams to shift the temporary roof quickly as the works progress.<\/p>\n<div id=\"attachment_506624\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-03-16-at-08.47.45.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-506624 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-03-16-at-08.47.45.png\" alt=\"-\" width=\"1738\" height=\"1142\"><\/a><\/p>\n<p class=\"wp-caption-text\">Fast Tent system supplied by The inflatable \u201cFast Tent\u201d system is supplied by Njordair. being inflated<\/p>\n<\/div>\n<p>Robertson said the approach is believed to be the first time inflatable roofing tents have been used for a construction roofing solution.<\/p>\n<p>Traditional scaffold shrink-wrap would have proved difficult on the complex hospital roof because of interconnected buildings and the need to maintain 24-hour access to key services including the oxygen store.<\/p>\n<p>Instead the contractor designed a lightweight scaffold system paired with modular air tents that create a fully weatherproof enclosure while minimising disruption to patients and staff.<\/p>\n<p>A total of 13 tents will be deployed across the 40-week programme to replace the maternity unit\u2019s RAAC roof.<\/p>\n<p>The tents are powered by the hospital\u2019s carbon-free electricity supply and are made from flame-retardant PVC designed to withstand strong winds and poor weather.<\/p>\n<p>Elliot Robertson, Chief Executive at Robertson Group, said: \u201cWe are always looking for new innovations that help us deliver projects.<\/p>\n<p>\u201cThis initiative demonstrates what\u2019s possible when our teams challenge convention, share expertise, and embrace innovation to deliver real value for our customers and the communities they serve.\u201d<\/p>\n<p>\u201cWe hope this redefines how complex roofing and refurbishment works can be delivered across our industry and inspires the exploration of smarter, more sustainable ways of working.\u201d<\/p>\n<p>Director and co-founder Aubrey Kingsbury said: \u201cOut of almost a decade of experience, we have never seen our product used in this way in the UK.\u201d<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/03\/16\/robertson-uses-blow-up-roof-to-keep-hospital-dry\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The inflatable tents have been installed as part of the RAAC replacement programme on the roof of Royal Bolton &#8230; <a title=\"Robertson uses blow-up roof to keep hospital dry\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/robertson-uses-blow-up-roof-to-keep-hospital-dry\/\" aria-label=\"Read more about Robertson uses blow-up roof to keep hospital dry\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34691","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34691"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34691\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}