{"id":34699,"date":"2026-03-17T04:39:41","date_gmt":"2026-03-17T11:39:41","guid":{"rendered":"https:\/\/essential.construction\/news\/flood-defence-pipeline-swells-with-1-4bn-boost\/"},"modified":"2026-03-17T04:39:41","modified_gmt":"2026-03-17T11:39:41","slug":"flood-defence-pipeline-swells-with-1-4bn-boost","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/flood-defence-pipeline-swells-with-1-4bn-boost\/","title":{"rendered":"Flood defence pipeline swells with \u00a31.4bn boost"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-506647\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Major schemes in the pipeline have already started and include the \u00a359m Bridgwater tidal barrier (Kier), \u00a337m Derby flood works (Sisk) and Kendal Flood Risk management scheme (VolkerStevin).<\/p>\n<p>The programme also spans small repairs works alongside a growing push on natural flood management to slow water upstream.<\/p>\n<p><a rel=\"noopener nofollow\" href=\"https:\/\/www.gov.uk\/government\/publications\/programme-of-flood-and-coastal-erosion-risk-management-schemes\" target=\"_blank\">Click here for full list of schemes.<\/a><\/p>\n<p>Around \u00a3260m has also been ringfenced for repairs and maintenance of existing assets, including damage caused by recent storms, marking a turnaround after years of declining asset condition.<\/p>\n<p>It forms part of a wider \u00a310.5bn investment plan running to 2036 \u2013 the largest flood protection programme ever seen in England.<\/p>\n<table class=\"tg\" style=\"border-collapse: collapse; border-spacing: 0; border: 2pt solid #ff511c; font-family: Arial, sans-serif;\">\n<tbody>\n<tr>\n<th style=\"background: #ff511c; color: #ffffff; font-size: 18pt; padding: 14px; text-align: left;\" colspan=\"3\">Major flood protection schemes<\/th>\n<\/tr>\n<tr style=\"background: #ffffff;\">\n<th style=\"border: 1pt solid #444; padding: 12px; font-size: 14px;\">Project<\/th>\n<th style=\"border: 1pt solid #444; padding: 12px; font-size: 14px;\">County<\/th>\n<th style=\"border: 1pt solid #444; padding: 12px; font-size: 14px;\">Investment (\u00a3m)<\/th>\n<\/tr>\n<tr style=\"background: #f9f9f9;\">\n<td style=\"border: 1pt solid #444; padding: 12px;\">Bridgwater Tidal Barrier Flood Defence Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Somerset<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">59.3<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Derby Flood Risk Management Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Derbyshire<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">37.1<\/td>\n<\/tr>\n<tr style=\"background: #f9f9f9;\">\n<td style=\"border: 1pt solid #444; padding: 12px;\">Kendal Flood Risk Management Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Cumbria<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">24.3<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Upper Thurne Integrated Drainage Improvements<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Norfolk<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">20.3<\/td>\n<\/tr>\n<tr style=\"background: #f9f9f9;\">\n<td style=\"border: 1pt solid #444; padding: 12px;\">Blackpool Beach Nourishment Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Lancashire<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">17.7<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1pt solid #444; padding: 12px;\">River Thames Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Surrey<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">17.0<\/td>\n<\/tr>\n<tr style=\"background: #f9f9f9;\">\n<td style=\"border: 1pt solid #444; padding: 12px;\">River Roch Flood Risk Management Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Greater Manchester<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">16.7<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Preston and South Ribble Flood Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Lancashire<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">15.2<\/td>\n<\/tr>\n<tr style=\"background: #f9f9f9;\">\n<td style=\"border: 1pt solid #444; padding: 12px;\">Bispham Coast Protection scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Lancashire<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">14.6<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Wareham Coastal Change \u2013 Poole Harbour Habitat Creation<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Dorset<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">12.3<\/td>\n<\/tr>\n<tr style=\"background: #f9f9f9;\">\n<td style=\"border: 1pt solid #444; padding: 12px;\">Saltfleet to Gibraltar Point Beach Management<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Lincolnshire<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">11.4<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Portsea Island \u2013 Southsea Coastal Flood Scheme<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">Hampshire<\/td>\n<td style=\"border: 1pt solid #444; padding: 12px;\">10.3<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Environment Agency flood boss Caroline Douglass added: \u201cWe\u2019re combining engineering and nature-based solutions to reduce flood risk and build long-term resilience.\u201d<\/p>\n<p>The investment is expected to support thousands of jobs across the supply chain while unlocking development in areas previously constrained by flood risk.<\/p>\n<p>Work will now ramp up across regional frameworks and delivery partners as schemes move into procurement and construction through 2026\/27.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/2026\/03\/17\/bid-races-starts-for-5-5bn-flood-defence-super-framework\/\" target=\"_blank\">Click here<\/a> for details of the next-generation flood defence framework going out to tender.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/03\/17\/flood-defence-pipeline-swells-with-1-4bn-boost\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Major schemes in the pipeline have already started and include the \u00a359m Bridgwater tidal barrier (Kier), \u00a337m Derby flood &#8230; <a title=\"Flood defence pipeline swells with \u00a31.4bn boost\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/flood-defence-pipeline-swells-with-1-4bn-boost\/\" aria-label=\"Read more about Flood defence pipeline swells with \u00a31.4bn boost\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34699","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34699"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34699\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}