{"id":34927,"date":"2026-04-04T17:15:27","date_gmt":"2026-04-05T00:15:27","guid":{"rendered":"https:\/\/essential.construction\/news\/berkeley-slams-brakes-on-land-buying-as-market-headwinds-bite\/"},"modified":"2026-04-04T17:15:27","modified_gmt":"2026-04-05T00:15:27","slug":"berkeley-slams-brakes-on-land-buying-as-market-headwinds-bite","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/berkeley-slams-brakes-on-land-buying-as-market-headwinds-bite\/","title":{"rendered":"Berkeley slams brakes on land buying as market headwinds bite"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The firm said it will largely stop buying land, warning it cannot hit required returns amid rising tax, regulation and soft sales.<\/p>\n<p>Instead, the developer will double down on extracting value from its existing sites and tightly control construction activity in line with demand and regulatory delays.<\/p>\n<p>The move comes despite Berkeley holding firm on its \u00a3450m pre-tax profit target for FY26, alongside a strong net cash position of around \u00a3300m.<\/p>\n<p>Berkeley said geopolitical instability and weaker expectations for interest rate cuts have already knocked back hopes of a near-term sales recovery.<\/p>\n<p>At the same time, the Building Safety Regulator regime is continuing to drag out delivery timelines, with Gateway 2 approvals adding around 12 months between planning and start on site.<\/p>\n<p>That delay is now feeding directly into programme phasing across Berkeley\u2019s schemes.<\/p>\n<p>The developer will now slow build-out rates, cut work-in-progress investment and sequence projects more carefully \u2014 a clear signal that contractors should expect a more staggered pipeline rather than volume growth in the short term.<\/p>\n<p>Berkeley said it will also flex the pace of its build-to-rent arm, Berkeley Living, despite early leasing success on its first scheme at Alexander Gate.<\/p>\n<p>Across the business, cost control remains central, with operating costs already cut from \u00a3178m to \u00a3150m in real terms over recent years.<\/p>\n<p>Looking ahead, Berkeley expects to deliver more than \u00a31.4bn of pre-tax profit over the next four years, with output weighted slightly towards 2027 before flattening out.<\/p>\n<p>Margins are being held in the 17.5% to 19.5% range \u2014 but only through tighter discipline on land, build rates and capital allocation.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/04\/01\/berkeley-slams-brakes-on-land-buying-as-market-headwinds-bite\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The firm said it will largely stop buying land, warning it cannot hit required returns amid rising tax, regulation &#8230; <a title=\"Berkeley slams brakes on land buying as market headwinds bite\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/berkeley-slams-brakes-on-land-buying-as-market-headwinds-bite\/\" aria-label=\"Read more about Berkeley slams brakes on land buying as market headwinds bite\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34927","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34927"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34927\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}