{"id":35006,"date":"2026-04-12T05:30:14","date_gmt":"2026-04-12T12:30:14","guid":{"rendered":"https:\/\/essential.construction\/news\/plans-in-for-814-home-salford-waterfront-scheme\/"},"modified":"2026-04-12T05:30:14","modified_gmt":"2026-04-12T12:30:14","slug":"plans-in-for-814-home-salford-waterfront-scheme","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/plans-in-for-814-home-salford-waterfront-scheme\/","title":{"rendered":"Plans in for 814-home Salford waterfront scheme"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-507319\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The Riverside Place development will consist of three brick-clad towers rising from 21 storeys to 35 storeys and is set to reshape a key stretch of the Irwell.<\/p>\n<p>It plans to redevelop a 2.2-acre site on Ordsall Lane and Regent Road \u2013 currently occupied by McDonald\u2019s, KFC and Grosvenor Casino \u2013 into a high-density residential quarter backed by Crescent Investments.<\/p>\n<div id=\"attachment_507320\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-04-08-at-23.41.01-scaled.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-507320 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-04-08-at-23.41.01-scaled.png\" alt=\"-\" width=\"2560\" height=\"1544\"><\/a><\/p>\n<p class=\"wp-caption-text\">A two-storey community pavilion will anchor the development, alongside more than 1.5 acres of new public realm.<\/p>\n<\/div>\n<p>The plans also include improved pedestrian and cycle links to the River Irwell, with landscaped routes, a new ramp and tiered seating reconnecting the site to the waterfront and wider routes towards Salford Quays and Manchester city centre.<\/p>\n<p>Chief executive Lyndon Forshaw said: \u201cThe final plans submitted are focused on community integration with the existing Ordsall neighbourhood, providing a Community Pavilion at the heart of the scheme.\u201d<\/p>\n<p>Demolition consent for the existing uses was secured in 2023, clearing the site for redevelopment.<\/p>\n<p>The scheme is expected to generate over 1,000 construction jobs and \u00a367m in economic value during a three-year build.<\/p>\n<p>Subject to planning approval, the project will move into procurement, with a contractor expected to be lined up ahead of a potential start on site within the next 12\u201318 months.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/04\/09\/plans-in-for-814-home-salford-waterfront-scheme\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The Riverside Place development will consist of three brick-clad towers rising from 21 storeys to 35 storeys and is &#8230; <a title=\"Plans in for 814-home Salford waterfront scheme\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/plans-in-for-814-home-salford-waterfront-scheme\/\" aria-label=\"Read more about Plans in for 814-home Salford waterfront scheme\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-35006","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35006"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35006\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}