{"id":35169,"date":"2026-04-25T05:59:18","date_gmt":"2026-04-25T12:59:18","guid":{"rendered":"https:\/\/essential.construction\/news\/graham-lands-60m-trafford-stretford-mall-flats-job\/"},"modified":"2026-04-25T05:59:18","modified_gmt":"2026-04-25T12:59:18","slug":"graham-lands-60m-trafford-stretford-mall-flats-job","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/graham-lands-60m-trafford-stretford-mall-flats-job\/","title":{"rendered":"Graham lands \u00a360m Trafford Stretford Mall flats job"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The contractor saw off competition from Domis, GMI and HG Construction to take the first major build to rent phase for the Bruntwood\u2013Trafford joint venture, known as Plot 2A.<\/p>\n<p>The \u00a360m win puts Graham in a strong position to pick up further work on the wider \u00a3175m pipeline covering two additional plots still to be procured.<\/p>\n<p>Plot 2A will deliver a 249-flat build-to-rent block with 200 sq m of ground floor commercial space, forming the centrepiece of the wider town centre regeneration.<\/p>\n<p>The scheme involves clearing a chunk of the ageing 1960s shopping centre to make way for a 10-storey square residential block arranged around a landscaped courtyard.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-12-09-at-07.24.58.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-504132 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-12-09-at-07.24.58.png\" alt=\"-\" width=\"692\" height=\"480\"><\/a><\/p>\n<p>Graham will initially work under a pre-construction services agreement to finalise the design and lock down the contract sum before moving to a full build contract.<\/p>\n<p>The council has flagged a further \u00a3115m of work behind this phase, including Plot 2B valued at \u00a345m and the larger Plot 1 at \u00a370m, with future awards dependent on performance.<\/p>\n<p>Construction is expected to run for just over three years once the full contract is signed, with completion targeted for 2029.<\/p>\n<p>The wider Stretford Mall masterplan will eventually deliver around 800 homes alongside new public realm and retail space, marking the biggest overhaul of the town centre in decades.<\/p>\n<div id=\"attachment_504132\" class=\"wp-caption aligncenter\">\n<p class=\"wp-caption-text\">The square housing block designed by AHR Architects wraps around a central landscaped park.<\/p>\n<\/div>\n<p>The project is the first major element of the wider scheme following the completion of King Street, a reimagined high street for Stretford that involved removing the roof from part of the mall and refurbishing several retail units totaling 86,000 sq ft.<\/p>\n<div class=\"break-out-box\">\n<h3>Stretford Town Centre Masterplan<\/h3>\n<hr>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-12-09-at-07.49.57.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-504134\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-12-09-at-07.49.57.png\" alt=\"-\" width=\"996\" height=\"602\"><\/a><\/p>\n<\/div>\n<p>In total, around 800 homes are planned as part of the Stretford Mall redevelopment.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/04\/24\/graham-lands-60m-trafford-stretford-mall-flats-job\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The contractor saw off competition from Domis, GMI and HG Construction to take the first major build to rent &#8230; <a title=\"Graham lands \u00a360m Trafford Stretford Mall flats job\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/graham-lands-60m-trafford-stretford-mall-flats-job\/\" aria-label=\"Read more about Graham lands \u00a360m Trafford Stretford Mall flats job\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-35169","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35169"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35169\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}