{"id":35256,"date":"2026-05-01T06:11:48","date_gmt":"2026-05-01T13:11:48","guid":{"rendered":"https:\/\/essential.construction\/news\/ready-mixed-concrete-sales-slump-in-london\/"},"modified":"2026-05-01T06:11:48","modified_gmt":"2026-05-01T13:11:48","slug":"ready-mixed-concrete-sales-slump-in-london","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/ready-mixed-concrete-sales-slump-in-london\/","title":{"rendered":"Ready-mixed concrete sales slump in London"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>Latest figures from the Mineral Products Association show UK demand for essential construction materials dropped further in the first quarter of 2026, extending a four-year downturn.<\/p>\n<p>Mortar sales, a key indicator of house building activity, fell 2% on the previous quarter and were 5.4% down year-on-year.<\/p>\n<p>Ready-mixed concrete sales slipped 0.5%, while primary aggregates fell 0.8%. Asphalt was broadly flat, down 0.1%, after a short-term boost from road maintenance work ahead of the financial year end.<\/p>\n<p>The slump has hit London particularly hard, where ready-mixed concrete volumes over the past 12 months were 47% lower than in 2022.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/b3e3b436-c8fd-4eca-ba8f-218b0b37710e.jpeg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-507895\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/b3e3b436-c8fd-4eca-ba8f-218b0b37710e.jpeg\" alt=\"-\" width=\"1199\" height=\"949\"><\/a><\/p>\n<p>MPA director of economic affairs Aurelie Delannoy said: \u201cThe Q1 data largely predates the recent escalation in global risks and energy prices, but it shows that UK construction demand was still falling as costs were starting to rise.<\/p>\n<p>\u201cSince February, early indications from MPA members point to higher fuel and production costs, alongside emerging signs of project delays and pauses, particularly on some lower-margin housing schemes.\u201d<\/p>\n<p>House building and commercial work continue to drag down demand, with higher borrowing costs, weak confidence and affordability pressures holding back investment.<\/p>\n<p>Infrastructure remains the only bright spot, with HS2 and Sizewell C helping to support aggregates demand. Crushed rock volumes rose 1% in Q1, but not enough to offset weakness elsewhere.<\/p>\n<p>MPA executive chair Chris Leese said: \u201cThere is no sign of recovery in the Q1 data, and this is likely to be further compounded by the economic fallout from events in the Middle East.<\/p>\n<p>\u201cDemand is still falling, and now costs are rising again. That is a difficult combination for any industry, and it raises real concerns about the outlook for construction this year.<\/p>\n<p>\u201cIf this continues, we are looking at a fifth consecutive year of decline.\u201d<\/p>\n<p>The MPA is calling for Government action to support housing demand, pump public funding into infrastructure and road maintenance, incentivise private construction investment through a super-deduction and cut costs for the sector.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/05\/01\/ready-mixed-concrete-sales-in-london-slump\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Latest figures from the Mineral Products Association show UK demand for essential construction materials dropped further in the first &#8230; <a title=\"Ready-mixed concrete sales slump in London\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/ready-mixed-concrete-sales-slump-in-london\/\" aria-label=\"Read more about Ready-mixed concrete sales slump in London\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-35256","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35256","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35256"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35256\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35256"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35256"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}