{"id":35295,"date":"2026-05-04T18:19:38","date_gmt":"2026-05-05T01:19:38","guid":{"rendered":"https:\/\/essential.construction\/news\/jrl-lands-608-home-london-thames-city-phase-2\/"},"modified":"2026-05-04T18:19:38","modified_gmt":"2026-05-05T01:19:38","slug":"jrl-lands-608-home-london-thames-city-phase-2","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/jrl-lands-608-home-london-thames-city-phase-2\/","title":{"rendered":"JRL lands 608-home London Thames City phase 2"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>Phase 2 will deliver 608 flats across five mansion-block buildings ranging from 12 to 22 storeys and is rumoured to be worth more than \u00a3300m.<\/p>\n<p>The job continues JRL\u2019s role on the landmark Vauxhall regeneration scheme, where it previously delivered the N8 and N9 towers.<\/p>\n<p>Those earlier towers, standing at 53 and 37 storeys, were handed over in 2022 and 2023 and are now largely sold and occupied.<\/p>\n<p>JRL said around 80% of the Phase 2 construction value will be delivered through its own specialist divisions, covering reinforced concrete frame, facades, MEP, bathroom pods and dry-lining.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-04-29-at-19.17.59.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-507842\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-04-29-at-19.17.59.png\" alt=\"-\" width=\"1884\" height=\"1292\"><\/a><\/p>\n<p>The group said the self-delivery model would give client Excel Winner a single point of accountability while improving programme management, quality control and supply chain coordination.<\/p>\n<p>The award swells JRL\u2019s order book to around \u00a32bn.<\/p>\n<p>A JRL Group spokesperson said: \u201cThames City has been an important project for JRL and we\u2019re pleased to be continuing our involvement with Phase 2.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-04-29-at-19.09.30.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-507843\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-04-29-at-19.09.30.png\" alt=\"-\" width=\"1092\" height=\"826\"><\/a><\/p>\n<p>\u201cExcel Winner has clear expectations and a strong commitment to quality, which makes for a great working relationship.<\/p>\n<p>\u201cWe know the development well, and between our main contracting capability and our in-house specialist divisions, we\u2019re well placed to deliver this first in class development.\u201d<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/04\/30\/jrl-lands-608-home-london-thames-city-phase-2\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Phase 2 will deliver 608 flats across five mansion-block buildings ranging from 12 to 22 storeys and is rumoured &#8230; <a title=\"JRL lands 608-home London Thames City phase 2\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/jrl-lands-608-home-london-thames-city-phase-2\/\" aria-label=\"Read more about JRL lands 608-home London Thames City phase 2\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-35295","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35295"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35295\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35295"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}