{"id":35320,"date":"2026-05-07T06:24:26","date_gmt":"2026-05-07T13:24:26","guid":{"rendered":"https:\/\/essential.construction\/news\/fp-mccann-tests-graphene-roof-tiles-on-site\/"},"modified":"2026-05-07T06:24:26","modified_gmt":"2026-05-07T13:24:26","slug":"fp-mccann-tests-graphene-roof-tiles-on-site","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/fp-mccann-tests-graphene-roof-tiles-on-site\/","title":{"rendered":"FP McCann tests graphene roof tiles on site"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>Following a series of rigorous production trials at its Cadeby plant, the manufacturer has demonstrated that graphene-enhanced formulations can be seamlessly integrated into existing, high-volume manufacturing processes.<\/p>\n<p>The latest phase of the programme builds upon an initial run in January, during which FP McCann produced a batch of 2,500 graphene-enhanced roof tiles.<\/p>\n<p>This early trial utilised material supplied through Breedon and First Graphene, proving the concept on a live production line without requiring any modifications to standard manufacturing methods.<\/p>\n<p>Subsequent trials have confirmed that this success can be replicated at scale under normal factory conditions while maintaining product quality that meets stringent production requirements.<\/p>\n<p>Through extensive laboratory optimisation and these full-scale trials, FP McCann has identified a formulation that is effectively factory-ready.<\/p>\n<p>A selection of the newly produced tiles is currently being installed on the new Cadeby office building. This live application allows the team to monitor long-term, in-situ performance alongside ongoing production and laboratory assessments.<\/p>\n<p>Dr Jacek Kwasny, Lead R&amp;D Engineer \u2013 Sustainable Materials at FP McCann said:\u00a0 \u201cThe success of these trials reflects the power of collaboration across the supply chain.<\/p>\n<p>\u201cWorking with First Graphene and the National Composites Centre, we\u2019ve moved graphene-enhanced concrete from the laboratory into a real manufacturing environment. The fact that we can achieve a 14% reduction in embodied carbon while maintaining our quality standards is genuinely exciting.\u201d<\/p>\n<p>While final durability and leaching assessments are still underway, the focus now shifts to transitioning the preferred formulation into routine commercial production.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/05\/07\/fp-mccann-tests-graphene-roof-tiles-on-site\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Following a series of rigorous production trials at its Cadeby plant, the manufacturer has demonstrated that graphene-enhanced formulations can &#8230; <a title=\"FP McCann tests graphene roof tiles on site\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/fp-mccann-tests-graphene-roof-tiles-on-site\/\" aria-label=\"Read more about FP McCann tests graphene roof tiles on site\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-35320","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35320"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35320\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}