{"id":35438,"date":"2026-05-16T06:44:02","date_gmt":"2026-05-16T13:44:02","guid":{"rendered":"https:\/\/essential.construction\/news\/the-dawes-climbs-above-heritage-grain-elevator-near-danforth-go\/"},"modified":"2026-05-16T06:44:02","modified_gmt":"2026-05-16T13:44:02","slug":"the-dawes-climbs-above-heritage-grain-elevator-near-danforth-go","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/the-dawes-climbs-above-heritage-grain-elevator-near-danforth-go\/","title":{"rendered":"The Dawes Climbs Above Heritage Grain Elevator Near Danforth GO"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Not far east of where the three colourful towers dubbed\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/rushden-station.40089\" target=\"_blank\">Rushden Station<\/a> reshaping Toronto&#8217;s Main Street and Danforth GO area as they rise higher, another major high-rise project has been steadily climbing with less fanfare. In Toronto\u2019s Danforth Village neighbourhood,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/dawes.36302\" target=\"_blank\">The Dawes<\/a> by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/marlin-spring-developments.21123\" target=\"_blank\">Marlin Spring Developments<\/a> and\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/osmington.7784\" target=\"_blank\">Osmington<\/a> has now pushed its taller tower beyond the halfway mark toward its eventual 43-storey height, alongside a rising 24-storey tower, as the\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/arcadis.8006\" target=\"_blank\">Arcadis<\/a>-designed, mixed-use development ascends from behind a former industrial grain elevator site.<\/p>\n<p dir=\"ltr\">Looking northwest actoss Dawes Road back in May, 2023, the retained 1906 industrial grain elevator structure remains standing with heritage retention work getting underway. Corrugated metal cladding and the weathered industrial facade remain intact, while a heavy steel scaffold frame has been assembled to the right to support the structure during rehabilitation works.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197814.jpeg\" data-entity-uuid=\"insert-display_default-800b1d1f-b18b-4163-a4b4-9d504f3cec69\" data-entity-type=\"file\" alt=\"The Dawes, Toronto, designed by Arcadis for Marlin Spring Developments and Osmington\" title=\"Looking northwest to the retained heritage grain elevator structure, image by UrbanToronto Forum contributor HousingNowTO,\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197814.jpeg', true, 'Looking northwest to the retained heritage grain elevator structure, image by UrbanToronto Forum contributor HousingNowTO,'); return false;\"><span class=\"image-description\">Looking northwest to the retained heritage grain elevator structure, image by UrbanToronto Forum contributor HousingNowTO,<\/span><\/p>\n<p dir=\"ltr\">Looking southeast to their rears, rehabilitation work on the heritage structures shows temporary walls wrapped in white Tyvek weatherproofing, in place alongside the original corrugated metal-clad volume.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197813.jpeg\" data-entity-uuid=\"insert-display_default-429cc2e2-fa16-4549-a91e-fe08461d23b2\" data-entity-type=\"file\" alt=\"The Dawes, Toronto, designed by Arcadis for Marlin Spring Developments and Osmington\" title=\"Looking southeast to heritage rehabilitation and weatherproofing, image by UrbanToronto Forum contributor HousingNowTO\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197813.jpeg', true, 'Looking southeast to heritage rehabilitation and weatherproofing, image by UrbanToronto Forum contributor HousingNowTO'); return false;\"><span class=\"image-description\">Looking southeast to heritage rehabilitation and weatherproofing, image by UrbanToronto Forum contributor HousingNowTO<\/span><\/p>\n<p dir=\"ltr\">Jumping three years to catch up to today, the taller tower at The Dawes has climbed well above the heritage structures. The reinforced concrete superstructure now rises with a notably slender floor-plate at its south end, while exposed slab edges, perimeter safety railings, and formwork remain in place at the uppermost levels. A construction hoist is installed on the east elevation. Below, green and white netting respectively covers the scaffold wraps the heritage rehabilitation area and the new build integration areas at the base.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197816.jpeg\" data-entity-uuid=\"insert-display_default-02bcf44a-4a8e-49e4-a213-dc1ebf372c25\" data-entity-type=\"file\" alt=\"The Dawes, Toronto, designed by Arcadis for Marlin Spring Developments and Osmington\" title=\"Looking northwest to the taller tower rising above heritage structures, image by UrbanToronto Forum contributor christiesplits\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197816.jpeg', true, 'Looking northwest to the taller tower rising above heritage structures, image by UrbanToronto Forum contributor christiesplits'); return false;\"><span class=\"image-description\">Looking northwest to the taller tower rising above heritage structures, image by UrbanToronto Forum contributor christiesplits<\/span><\/p>\n<p dir=\"ltr\">This view highlights the massing composition, where the slender, wedge-shaped residential tower rises from its podium. The concrete frame shows pronounced projecting balcony stacks along both tower the wise west and narrow south faces, creating a repetitive grid of slab edges and recessed vertical breaks. At the lower levels, the podium transitions through a series of open structural bays and transfer slabs supported by thick, cylindrical concrete columns, including an especially prominent oversized column at the corner behind the heritage structures.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197815.jpeg\" data-entity-uuid=\"insert-display_default-f6fb98b2-567a-4cdb-a3a1-f4c199e83b4a\" data-entity-type=\"file\" alt=\"The Dawes, Toronto, designed by Arcadis for Marlin Spring Developments and Osmington\" title=\"Looking northwest to the podium and tower massing taking shape, image by UrbanToronto Forum contributor christiesplits\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197815.jpeg', true, 'Looking northwest to the podium and tower massing taking shape, image by UrbanToronto Forum contributor christiesplits'); return false;\"><span class=\"image-description\">Looking northwest to the podium and tower massing taking shape, image by UrbanToronto Forum contributor christiesplits<\/span><\/p>\n<p dir=\"ltr\">Looking west, the taller tower has risen to approximately 26 storeys. The structure is being formed at the 27th floor, while below, a six-storey podium volume projects northward toward where the shorter 24-storey tower \u2014 its footprint marked by the second blue crane \u2014 will rise. Roughly one level of it is formed so far. Formwork tables are staged atop the connecting podium roof. In the distance to the right, high-rise construction of one of the Rushden Station towers makes it into the frame.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197817.jpg\" data-entity-uuid=\"insert-display_default-6d84e569-1b0e-4b40-94de-ef417e0f6fcd\" data-entity-type=\"file\" alt=\"The Dawes, Toronto, designed by Arcadis for Marlin Spring Developments and Osmington\" title=\"Looking west to The Dawes rising beside Rushden Station near Danforth GO, image by UrbanToronto Forum contributor CLT\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197817.jpg', true, 'Looking west to The Dawes rising beside Rushden Station near Danforth GO, image by UrbanToronto Forum contributor CLT'); return false;\"><span class=\"image-description\">Looking west to The Dawes rising beside Rushden Station near Danforth GO, image by UrbanToronto Forum contributor CLT<\/span><\/p>\n<p dir=\"ltr\">Once complete, The Dawes will rise 43 and 24 storeys, reaching heights of 143.91m and 83.7m respectively, while delivering 688 condominium units to Toronto&#8217;s East End.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197818.jpg\" data-entity-uuid=\"insert-display_default-aa9e81ae-a26c-4327-8a2f-88002d1d7327\" data-entity-type=\"file\" alt=\"The Dawes, Toronto, designed by Arcadis for Marlin Spring Developments and Osmington\" title=\"Looking northeast to The Dawes, designed by Arcadis for Marlin Spring Developments and Osmington\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61007\/61007-197818.jpg', true, 'Looking northeast to The Dawes, designed by Arcadis for Marlin Spring Developments and Osmington'); return false;\"><span class=\"image-description\">Looking northeast to The Dawes, designed by Arcadis for Marlin Spring Developments and Osmington<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/05\/dawes-climbs-above-heritage-grain-elevator-near-danforth-go.61007\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Not far east of where the three colourful towers dubbed\u00a0Rushden Station reshaping Toronto&#8217;s Main Street and Danforth GO area &#8230; <a title=\"The Dawes Climbs Above Heritage Grain Elevator Near Danforth GO\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/the-dawes-climbs-above-heritage-grain-elevator-near-danforth-go\/\" aria-label=\"Read more about The Dawes Climbs Above Heritage Grain Elevator Near Danforth GO\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-35438","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35438"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35438\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}