{"id":35448,"date":"2026-05-17T06:46:35","date_gmt":"2026-05-17T13:46:35","guid":{"rendered":"https:\/\/essential.construction\/news\/toronto-unveils-names-for-new-electric-ferries-amid-jack-layton-terminal-upgrades\/"},"modified":"2026-05-17T06:46:35","modified_gmt":"2026-05-17T13:46:35","slug":"toronto-unveils-names-for-new-electric-ferries-amid-jack-layton-terminal-upgrades","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/toronto-unveils-names-for-new-electric-ferries-amid-jack-layton-terminal-upgrades\/","title":{"rendered":"Toronto Unveils Names for New Electric Ferries Amid Jack Layton Terminal Upgrades"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Toronto\u2019s long-planned transition toward a modernized Island ferry system took another step forward today, as the City unveiled the names of its first two fully electric ferries while showcasing ongoing infrastructure upgrades at the\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/jack-layton-ferry-terminal-and-harbour-square-park.14274\" target=\"_blank\">Jack Layton Ferry Terminal<\/a>. Announced by Mayor Olivia Chow and Deputy Mayor Ausma Malik, the new vessels \u2014\u00a0<em>Lady of the Quays<\/em> and\u00a0<em>Toronto Islander<\/em> \u2014 are now being built in Romania, while works at the downtown ferry terminal continue to prepare for charging infrastructure, expanded passenger capacity, and upgraded accessibility supporting the roughly 1.4 million annual trips to Toronto Island.<\/p>\n<p dir=\"ltr\">\u201cThese vessels represent a historic investment in Toronto\u2019s waterfront,\u201d said Chow. \u201cAs the first new ferries in more than 60 years, they will modernize this essential service, significantly increase capacity, and support a fully zero-emissions fleet. The City continues to improve visitor experience and access to the Toronto Island, helping prepare for a busy summer and the FIFA World Cup.\u201d\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197778.jpg\" data-entity-uuid=\"insert-display_default-5704f235-aa06-4e45-9323-57275cfa9206\" data-entity-type=\"file\" alt=\"Rendering of the Lady of the Quays, image by City of Toronto\" title=\"Rendering of the Lady of the Quays, image by City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197778.jpg', true, 'Rendering of the Lady of the Quays, image by City of Toronto'); return false;\"><span class=\"image-description\">Rendering of the Lady of the Quays, image by City of Toronto<\/span><\/p>\n<p dir=\"ltr\">The names were selected through a four-week public vote that drew nearly 18,000 submissions.\u00a0<em>Lady of the Quays<\/em>, submitted by the York Quay Neighbourhood Association, was selected for the new vehicle-and-passenger ferry replacing the\u00a0<em>Ongiara<\/em>, while\u00a0<em>Toronto Islander<\/em> was chosen for the passenger-only replacement for the 1935-built\u00a0<em>William Inglis<\/em>. Scheduled to arrive in late 2026 and 2027, respectively, the vessels will significantly increase passenger capacity, with both ferries accommodating up to approximately 1,300 riders.<\/p>\n<p dir=\"ltr\">The replacement vessels will introduce wider ramps, accessible washrooms, enclosed passenger areas, improved circulation layouts, and expanded seating while modernizing a fleet whose main vessels date from 1935 through 1963. The first ferry will retain winter ice-breaking capability while increasing carrying capacity over the existing\u00a0<em>Ongiara<\/em>, while future replacement plans for the\u00a0<em>Sam McBride<\/em> and\u00a0<em>Thomas Rennie<\/em> remain included within the City\u2019s long-term capital program.<\/p>\n<p dir=\"ltr\">\u201cToronto is welcoming two new, higher capacity, faster, all-electric ferries,\u201d said Malik. \u201cThese vessels will make trips to Toronto Island Park even more accessible and enjoyable. Naming boats is a long-standing tradition and I\u2019m excited that Torontonians had the opportunity to help name these new additions.\u201d\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197779.jpg\" data-entity-uuid=\"insert-display_default-897ecb88-c2d1-478d-adcc-018217529a74\" data-entity-type=\"file\" alt=\"Rendering of the Lady of the Quays, image by City of Toronto\" title=\"Rendering of the Toronto Islander, image by City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197779.jpg', true, 'Rendering of the Toronto Islander, image by City of Toronto'); return false;\"><span class=\"image-description\">Rendering of the Toronto Islander, image by City of Toronto<\/span><\/p>\n<p dir=\"ltr\">Designed by Quebec-based Concept Naval and being built by Damen Shipyards in Galati, Romania, the ferries form part of the City\u2019s TransformTO emissions reduction strategy. Once all four primary ferries are replaced, the City estimates the transition could reduce greenhouse gas emissions by roughly 2,900 tonnes annually and lower fuel costs by more than $1 million per year. Residents previously selected the ferries\u2019 \u201cArt + Social\u201d interior concept through a public vote favouring a brighter, gallery-inspired design.<\/p>\n<p dir=\"ltr\">The City also outlined waterfront and Toronto Island improvements planned ahead of the summer season, including upgraded queueing areas and digital displays at the ferry terminal, accessibility and dune restoration work at Hanlan\u2019s Point Beach, expanded Bike Share facilities, and new and returning attractions at Centreville. The ongoing upgrades also connect to longer-term ambitions for the future transformation of the ferry terminal and Harbour Square Park area, first explored through <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/waterfront-toronto.7861\" target=\"_blank\">Waterfront Toronto<\/a>\u2019s 2015 design competition.<\/p>\n<p dir=\"ltr\">Looking east in March, 2026, marine construction activity is underway beside the Jack Layton Ferry Terminal as crews continue infrastructure upgrades supporting the incoming electric ferry fleet. A lattice-boom crane extends its hoist line toward a neighbouring floating platform, where workers are handling a large rebar cage likely tied to dockwall and marine foundation works. Behind the waterfront hoarding, a vertical drilling rig equipped with a rotary piling attachment rises above the site, indicating ongoing foundation and mooring infrastructure installation associated with the terminal\u2019s new electrical charging and docking systems.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197774.jpg\" data-entity-uuid=\"insert-display_default-b9130079-2c55-43a1-b455-7899f374870f\" data-entity-type=\"file\" alt=\"Jack Layton Ferry Terminal, Waterfront Toronto\" title=\"Looking east to marine construction activity and crane beside the Jack Layton Ferry Terminal, image by UrbanToronto Forum contributor achandi\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197774.jpg', true, 'Looking east to marine construction activity and crane beside the Jack Layton Ferry Terminal, image by UrbanToronto Forum contributor achandi'); return false;\"><span class=\"image-description\">Looking east to marine construction activity and crane beside the Jack Layton Ferry Terminal, image by UrbanToronto Forum contributor achandi<\/span><\/p>\n<p dir=\"ltr\">A view from the waterfront boardwalk, a few days later, captures the large cylindrical steel reinforcement cage that has now been staged alongside additional pipe sections and construction materials awaiting installation.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197775.jpeg\" data-entity-uuid=\"insert-display_default-8a939b0a-5ca2-4acb-8dd7-1dda5cb67af0\" data-entity-type=\"file\" alt=\"Jack Layton Ferry Terminal, Waterfront Toronto\" title=\"Looking southeast to floating work platforms and dockwall rehabilitation works, image by UrbanToronto Forum contributor mburrrrr\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197775.jpeg', true, 'Looking southeast to floating work platforms and dockwall rehabilitation works, image by UrbanToronto Forum contributor mburrrrr'); return false;\"><span class=\"image-description\">Looking southeast to floating work platforms and dockwall rehabilitation works, image by UrbanToronto Forum contributor mburrrrr<\/span><\/p>\n<p dir=\"ltr\">Looking west across the waterfront, the full extent of the marine works comes into view as construction continues on the shoreside infrastructure. Temporary trailers, staging areas, construction fencing wrapped in blue screening, and stockpiled materials line the terminal frontage. A green articulating boom lift operates on the right for works associated with the electrical systems and charging infrastructure that will support the incoming ferries beginning in late 2026.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197776.jpeg\" data-entity-uuid=\"insert-display_default-b5a026c4-dd90-40e6-8b8a-6f64ff53a99f\" data-entity-type=\"file\" alt=\"Jack Layton Ferry Terminal, Waterfront Toronto\" title=\"Looking west across the broader marine infrastructure and charging system works, image by UrbanToronto Forum contributor ProjectEnd\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/60999\/60999-197776.jpeg', true, 'Looking west across the broader marine infrastructure and charging system works, image by UrbanToronto Forum contributor ProjectEnd'); return false;\"><span class=\"image-description\">Looking west across the broader marine infrastructure and charging system works, image by UrbanToronto Forum contributor ProjectEnd<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/05\/toronto-unveils-names-new-electric-ferries-amid-jack-layton-terminal-upgrades.60999\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Toronto\u2019s long-planned transition toward a modernized Island ferry system took another step forward today, as the City unveiled the &#8230; <a title=\"Toronto Unveils Names for New Electric Ferries Amid Jack Layton Terminal Upgrades\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/toronto-unveils-names-for-new-electric-ferries-amid-jack-layton-terminal-upgrades\/\" aria-label=\"Read more about Toronto Unveils Names for New Electric Ferries Amid Jack Layton Terminal Upgrades\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-35448","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35448"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35448\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}