{"id":35472,"date":"2026-05-19T17:14:24","date_gmt":"2026-05-20T00:14:24","guid":{"rendered":"https:\/\/essential.construction\/news\/stv-turner-jv-to-manage-construction-of-10b-nyc-bus-terminal\/"},"modified":"2026-05-19T17:14:24","modified_gmt":"2026-05-20T00:14:24","slug":"stv-turner-jv-to-manage-construction-of-10b-nyc-bus-terminal","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/stv-turner-jv-to-manage-construction-of-10b-nyc-bus-terminal\/","title":{"rendered":"STV-Turner JV to manage construction of $10B NYC bus terminal"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"text-to-speech\">\n    <button class=\"text-to-speech__button button\"><br \/>\n        <img decoding=\"async\" class=\"text-to-speech__button__icon\" src=\"https:\/\/www.constructiondive.com\/static\/img\/play.svg?313321260226\" alt=\"-\"><br \/>\n        Listen to the article<\/p>\n<p>            <span class=\"text-to-speech__button__audio-length\">3 min<\/span><\/p>\n<p>    <\/button><\/p>\n<div class=\"text-to-speech__controls\">\n        <audio controls=\"\" class=\"js-text-to-speech\" preload=\"none\"><source src=\"https:\/\/text-to-speech.divecdn.com\/newspost\/820626\/2026-05-19_12.58.53\/stv-turner-midtown-bus-terminal-new-york-city.wav\" type=\"audio\/mp3\"><\/source><\/audio><\/p>\n<div class=\"text-to-speech__controls__text\">\n            This audio is auto-generated. Please let us know if you have <a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/contact\/\" target=\"_blank\">feedback<\/a>.\n        <\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"ed-secondary-content-box ed-secondary-content-box--expandable\">\n<p><strong>Award: <\/strong>Construction management<br \/><strong>Value: <\/strong><span><span><span><span><span><span>Not disclosed, $10 billion for overall project<\/span><\/span><\/span><\/span><\/span><\/span><br \/><strong>Location: <\/strong><span><span><span><span><span><span>New York City<\/span><\/span><\/span><\/span><\/span><\/span><br \/><strong>Client: <\/strong><span><span><span><span><span><span>Port Authority of New York and New Jersey<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/div>\n<p><span><span><span><span><span><span>The Port Authority of New York and New Jersey has picked two New York City-based construction giants to oversee the initial buildout of <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.turnerconstruction.com\/insights\/stv-turner-selected-for-first-phase-of-transformative-midtown-bus-terminal-replacement\" target=\"_blank\"><span><span><span><span><span><span><span><span>a new $10 billion bus terminal<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> in the Big Apple.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>A joint venture of STV and Turner Construction will act as construction manager for Phase 1 of the Midtown Bus Terminal Replacement, according to a Monday news release from the builders. The contract amount was not disclosed.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The phase includes the construction of an interim, 900,000-square-foot, seven-level terminal and new ramp infrastructure. The improvements will enable bus service to continue for more than 200,000 daily commuters while the full terminal replacement proceeds, according to the release.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Last summer, the Port Authority picked <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/news\/tutor-perini-contract-midtown-bus-terminal\/752260\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>Los Angeles-based Tutor Perini as the contractor<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> to build the ramp structure and interim terminal for Phase 1 under a $1.87 billion guaranteed maximum price contract. The STV-Turner joint venture will serve as the construction manager overseeing that work, according to Turner Spokesperson Chris McFadden.\u00a0\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The construction team will coordinate demolition, new construction and integration with existing transportation systems in one of Manhattan\u2019s most densely trafficked areas. When the full terminal project is complete, new ramps will lead into and out of the Lincoln Tunnel, which connects Manhattan and New Jersey.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Phase 1 also encompasses the construction of <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.portauthoritybuilds.com\/redevelopment\/us\/en\/mbt\/project-components\/dyer-ave-deck-overs.html\" target=\"_blank\"><span><span><span><span><span><span><span><span>the Dyer Avenue deck-overs<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, or elevated platforms over the below-grade portions of Dyer Avenue and the Lincoln Tunnel Expressway.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Those deck-overs will host buses during construction and transform into 3.5 acres of public open space once the larger build is complete. AECOM Tishman is the construction manager for that deck-over project, with MLJ Contracting serving as the general contractor, according to the Port Authority\u2019s project page.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.panynj.gov\/content\/dam\/corporate\/board-meeting-pdfs\/Revised%20Public%20Agenda%20(7-24-25).pdf\" target=\"_blank\"><span><span><span><span><span><span><span><span>Phase 2 of the bus terminal project<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> will then include the demolition of the existing terminal, which first opened in 1950, and construction of a new terminal on the current site, according to the Port Authority. At that point, the interim terminal will transition into a bus staging and storage facility. <\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>\u201cThis is one of the most complex transportation construction programs in the country and it demands disciplined execution from day one, so our focus is keeping buses moving, protecting the community and delivering Phase 1 safely while setting the foundation for the full redevelopment,\u201d said Gus Maimis, deputy project manager for the program management and construction management operating group at STV, in the news release.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>STV and Turner have teamed up on other major infrastructure builds in the past. The pair worked together at LaGuardia Airport, the New York Police Academy and Ruth Bader Ginsburg Hospital, according to the release.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>\u201cDelivering this project in the heart of Manhattan, while keeping the terminal fully operational, requires precise planning and disciplined execution,\u201d said Christopher Zegler, vice president and principal in charge at Turner, in the news release. \u201cOur team is focused on safely advancing this critical first phase while keeping the region moving and laying the foundation for the modern, resilient, net-zero gateway for New York\u2019s commuters and visitors.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/stv-turner-midtown-bus-terminal-new-york-city\/820626\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Listen to the article 3 min This audio is auto-generated. Please let us know if you have feedback. Award: &#8230; <a title=\"STV-Turner JV to manage construction of $10B NYC bus terminal\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/stv-turner-jv-to-manage-construction-of-10b-nyc-bus-terminal\/\" aria-label=\"Read more about STV-Turner JV to manage construction of $10B NYC bus terminal\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-35472","post","type-post","status-publish","format-standard","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35472"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35472\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}