{"id":35538,"date":"2026-05-24T19:01:22","date_gmt":"2026-05-25T02:01:22","guid":{"rendered":"https:\/\/essential.construction\/news\/gilgan-family-queensway-health-centre-expansion-tops-off-in-etobicoke\/"},"modified":"2026-05-24T19:01:22","modified_gmt":"2026-05-25T02:01:22","slug":"gilgan-family-queensway-health-centre-expansion-tops-off-in-etobicoke","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/gilgan-family-queensway-health-centre-expansion-tops-off-in-etobicoke\/","title":{"rendered":"Gilgan Family Queensway Health Centre Expansion Tops Off in Etobicoke"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Construction has now topped off southwest of The Queensway and The West Mall on the\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/gilgan-family-queensway-health-centre.44533\" target=\"_blank\">Gilgan Family Queensway Health Centre<\/a> expansion in Etobicoke, across from Sherway Gardens. Designed by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/stantec.8062\" target=\"_blank\">Stantec<\/a> for\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/trillium-health-partners.44532\" target=\"_blank\">Trillium Health Partners<\/a>, the new H-shaped wing is replacing former surface parking areas north of the existing hospital with a patient care expansion containing more than 113,000m\u00b2 of institutional space providing\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2024\/02\/contract-awarded-gilgan-family-queensway-health-centre-patient-care-tower.55304\" target=\"_blank\">over 350 new private patient rooms<\/a>.<\/p>\n<p dir=\"ltr\">In a drone view from October, 2024, early substructure work was well underway beside the hospital&#8217;s existing McCaul Centre for Continuing Care to the right. Two recently installed cranes rise above the single-level excavation. Around the crane bases, concrete columns and formwork define the two-level below-grade structure, while a red concrete boom pump stretches into the excavation in the background. Across the site are tracked excavators, drill rigs, and earthmoving equipment.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-197997.jpeg\" data-entity-uuid=\"insert-display_default-71641a94-33cd-4be6-a308-1fe195ba3835\" data-entity-type=\"file\" alt=\"Gilgan Family Queensway Health Centre, Toronto, designed by Stantec for Trillium Health Partners\" title=\"A drone view looking northeast to the two tower cranes and excavation, image by UrbanToronto Forum contributor Tim MacDonald\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-197997.jpeg', true, 'A drone view looking northeast to the two tower cranes and excavation, image by UrbanToronto Forum contributor Tim MacDonald'); return false;\"><span class=\"image-description\">A drone view looking northeast to the two tower cranes and excavation, image by UrbanToronto Forum contributor Tim MacDonald<\/span><\/p>\n<p dir=\"ltr\">In April, 2025, construction had transitioned above grade, with the first floor formed and decking in place for the second-floor slab. A grid of circular reinforced concrete columns features rebar projecting upward in anticipation of second level extensions. Crew members can be seen next to a green scissor lift, a series of wall forms to the right, and atop the structure in the background.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-197998.jpg\" data-entity-uuid=\"insert-display_default-834bf707-8eef-4994-a81a-567bc0b278a5\" data-entity-type=\"file\" alt=\"Gilgan Family Queensway Health Centre, Toronto, designed by Stantec for Trillium Health Partners\" title=\"Looking north to the emerging structure now above grade, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-197998.jpg', true, 'Looking north to the emerging structure now above grade, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking north to the emerging structure now above grade, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p>From across The West Mall and The Queensway at the beginning of 2026, the north volume had then reached its full eight-storey height, with the structural frame topped off beneath the twin cranes overhead. A construction hoist is installed in the centre of the elevation. Below, the first two floors have progressed into the enclosure phase, where blue-and-white weatherproofing wrap the facade ahead of final cladding installation, while sections of glazing and window framing have already been installed.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198007.jpg\" data-entity-uuid=\"insert-display_default-73c043ff-dd65-440d-bbd1-9510667fc66d\" data-entity-type=\"file\" alt=\"Gilgan Family Queensway Health Centre, Toronto, designed by Stantec for Trillium Health Partners\" title=\"Looking south from The Queensway to the topped-off north volume, image by UrbanToronto Forum contributor YongeBloor\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198007.jpg', true, 'Looking south from The Queensway to the topped-off north volume, image by UrbanToronto Forum contributor YongeBloor'); return false;\"><span class=\"image-description\">Looking south from The Queensway to the topped-off north volume, image by UrbanToronto Forum contributor YongeBloor<\/span><\/p>\n<p dir=\"ltr\">This month, the new patient care building stands topped off. Between the two arms, a glazed connecting volume with curtain wall glazing establishes the central circulation spine, tying the complex together. Large sections of the facades remain wrapped in blue, white, or green weatherproofing. Along the east elevations, twin mast-climbing work platforms are attached to the structures to support facade installation and exterior finishing operations, with one active platform visible near the sixth floor at right. Below, darker pre-cladding panels and installed glazing are visible.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198001.jpg\" data-entity-uuid=\"insert-display_default-00cef2f0-2fae-49b3-ab3f-7f77bc87cc00\" data-entity-type=\"file\" alt=\"Gilgan Family Queensway Health Centre, Toronto, designed by Stantec for Trillium Health Partners\" title=\"Looking west to advancing enclosure work and the glazed connecting mid-volume, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198001.jpg', true, 'Looking west to advancing enclosure work and the glazed connecting mid-volume, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking west to advancing enclosure work and the glazed connecting mid-volume, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">Looking north, the project\u2019s H-shaped massing becomes more legible as the two primary patient care wings frame the recessed central connector volume. A lower two-storey component stands to the left, wrapped in blue-and-white weatherproofing. Above the complex, a single remaining crane continues servicing the site.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198004.jpg\" data-entity-uuid=\"insert-display_default-b8152905-cfab-46df-8bd2-47b3677f2c65\" data-entity-type=\"file\" alt=\"Gilgan Family Queensway Health Centre, Toronto, designed by Stantec for Trillium Health Partners\" title=\"Looking east to the single tower crane and two-storey structure on the west side of the site, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198004.jpg', true, 'Looking east to the single tower crane and two-storey structure on the west side of the site, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking east to the single tower crane and two-storey structure on the west side of the site, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">A close-up of the northeast corner shows the first sections of the final facade system now being installed. Silver-grey aluminum cladding panels have been mounted over a black sub-framing support assembly, alongside window openings with installed glazing. To the left, orange weather tarping continues where open floor edges persist.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198003.jpg\" data-entity-uuid=\"insert-display_default-e25551b4-d0ed-4353-9ab3-f979f403e0aa\" data-entity-type=\"file\" alt=\"Gilgan Family Queensway Health Centre, Toronto, designed by Stantec for Trillium Health Partners\" title=\"Facade panels installed at the northeast corner, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198003.jpg', true, 'Facade panels installed at the northeast corner, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Facade panels installed at the northeast corner, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">Scheduled for completion in 2029, the redevelopment will consist of structures rising as high as 45.1m.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198002.jpeg\" data-entity-uuid=\"insert-display_default-f2ff9db6-6573-4d75-80fb-32487df3e1d2\" data-entity-type=\"file\" alt=\"Gilgan Family Queensway Health Centre, Toronto, designed by Stantec for Trillium Health Partners\" title=\"Looking west to the Gilgan Family Queensway Health Centre patient care tower, designed by Stantec for Trillium Health Partners\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/05\/61035\/61035-198002.jpeg', true, 'Looking west to the Gilgan Family Queensway Health Centre patient care tower, designed by Stantec for Trillium Health Partners'); return false;\"><span class=\"image-description\">Looking west to the Gilgan Family Queensway Health Centre patient care tower, designed by Stantec for Trillium Health Partners<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/05\/gilgan-family-queensway-health-centre-expansion-tops-etobicoke.61035\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Construction has now topped off southwest of The Queensway and The West Mall on the\u00a0Gilgan Family Queensway Health Centre &#8230; <a title=\"Gilgan Family Queensway Health Centre Expansion Tops Off in Etobicoke\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/gilgan-family-queensway-health-centre-expansion-tops-off-in-etobicoke\/\" aria-label=\"Read more about Gilgan Family Queensway Health Centre Expansion Tops Off in Etobicoke\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-35538","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35538"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35538\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}