{"id":35545,"date":"2026-05-25T18:44:27","date_gmt":"2026-05-26T01:44:27","guid":{"rendered":"https:\/\/essential.construction\/news\/new-billion-dollar-plus-science-centre-breaks-ground-at-ontario-place\/"},"modified":"2026-05-25T18:44:27","modified_gmt":"2026-05-26T01:44:27","slug":"new-billion-dollar-plus-science-centre-breaks-ground-at-ontario-place","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/new-billion-dollar-plus-science-centre-breaks-ground-at-ontario-place\/","title":{"rendered":"New billion-dollar-plus science centre breaks ground at Ontario place"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>TORONTO\u00a0\u2014 The provincial government has officially broken ground on the <a rel=\"noopener nofollow\" href=\"https:\/\/projects.constructconnect.com\/details\/6304385-rfp-design-ontario-science-centre-relocation-to-ontario-place&amp;find_loc=-M3C-1T3\" target=\"_blank\">new Ontario Science Centre<\/a>, one of the key components to the revitalized Ontario Place development and one of the most talked-about moves since the old facility <a rel=\"noopener nofollow\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/government\/2024\/06\/province-closes-ontario-science-centre-immediately-citing-structural-issues\" target=\"_blank\">was shuttered in 2024.<\/a><\/p>\n<p>The new 400,000-square-foot facility is on track to open in 2029, explains a release, and will feature a mainland building, an integrated pod complex, interactive exhibits, an upgraded Cinesphere and more programming space than the previous site.<\/p>\n<p><a rel=\"noopener nofollow\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2026\/02\/1-04b-contract-awarded-for-new-ontario-science-centre-as-final-design-unveiled\" target=\"_blank\">In February<\/a>, Infrastructure Ontario (IO) and the Ministry of Tourism, Culture and Gaming awarded a contract of $1.04 billion to Ontario Science Partners to design, build, finance and maintain a new Ontario Science Centre facility.<\/p>\n<p>\u00a0<\/p>\n<figure id=\"attachment_535439\" aria-describedby=\"caption-attachment-535439\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-535439\" src=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/05\/OSC_P1_INT_Atriumweb.png\" alt=\"The new 400,000-square foot facility will feature a mainland building, an integrated pod complex, interactive exhibits, an upgraded Cinesphere and more programming space than at the previous site. Shown is the atrium.\" width=\"600\" height=\"381\" srcset=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/05\/OSC_P1_INT_Atriumweb.png 600w, https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/05\/OSC_P1_INT_Atriumweb-300x191.png 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\"\/><figcaption id=\"caption-attachment-535439\" class=\"wp-caption-text\">COURTESY PROVINCE OF ONTARIO \u2014 The new 400,000-square foot facility will feature a mainland building, an integrated pod complex, interactive exhibits, an upgraded Cinesphere and more programming space than at the previous site. Shown is the atrium.<\/figcaption><\/figure>\n<p>\u00a0<\/p>\n<p>The project team includes:\u00a0<\/p>\n<ul>\n<li>Applicant\u00a0leads:\u00a0John Laing Limited, Sacyr Infrastructure Canada\u00a0Inc.\u00a0and Amico Major Projects Inc.\u00a0<\/li>\n<li>Design\u00a0team:\u00a0Hariri\u00a0Pontarini\u00a0Architects &amp;\u00a0Sn\u00f8hetta\u00a0<\/li>\n<li>Construction\u00a0team:\u202fSacyr Canada Inc, and Amico Design Build Inc.\u00a0<\/li>\n<li>Facilities\u00a0management:\u202fJohnson Controls Canada L.P.\u00a0<\/li>\n<li>Financial\u00a0adviser:\u00a0Agentis\u00a0Capital Advisors\u00a0<\/li>\n<\/ul>\n<p>But while this milestone is being celebrated by the province and stakeholders, the decision to close the other facility was hotly contested, with many saying the money to build the new facility should have went into repairing the old one at 770 Don Mills Road.<\/p>\n<p>It was discovered the former site had \u201cserious structural deficiencies\u201d with the roof of the building.<\/p>\n<p>A business case based on a building condition assessment that was done by Pinchin Ltd. engineers in April 2022 concluded at least $478 million in capital repairs would be required to help repair and replace outdated infrastructure at the old facility.<\/p>\n<p>\u00a0<\/p>\n<figure id=\"attachment_535433\" aria-describedby=\"caption-attachment-535433\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-535433\" src=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/05\/OSC_P1_EXT_Aerial_SWweb.png\" alt=\"In February, Infrastructure Ontario and the Ministry of Tourism, Culture and Gaming awarded a contract of $1.04 billion to Ontario Science Partners to design, build, finance and maintain a new Ontario Science Centre facility.\" width=\"500\" height=\"492\" srcset=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/05\/OSC_P1_EXT_Aerial_SWweb.png 500w, https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/05\/OSC_P1_EXT_Aerial_SWweb-300x295.png 300w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\"\/><figcaption id=\"caption-attachment-535433\" class=\"wp-caption-text\">COURTESY PROVINCE OF ONTARIO \u2014 In February, Infrastructure Ontario and the Ministry of Tourism, Culture and Gaming awarded a contract of $1.04 billion to Ontario Science Partners to design, build, finance and maintain a new Ontario Science Centre facility.<\/figcaption><\/figure>\n<p>\u00a0<\/p>\n<p>The province decided to move in another direction and the Harbourfront Centre was selected to serve as the interim location for the science centre until its permanent home at Ontario Place is ready.<\/p>\n<p>The current build will support more than 1,000 construction and tourism jobs, the release adds.<\/p>\n<p>The broader Ontario Place development will feature more than 50 acres of free public trails, expanded green space, playgrounds, interactive fountains, new beaches, event spaces, a modernized marina and the redesigned RBC Amphitheatre.<\/p>\n<p>Its <a rel=\"noopener nofollow\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/government\/2025\/06\/final-ontario-place-designs-unveiled-no-decision-on-temporary-science-centre-location\" target=\"_blank\">final designs were unveiled in June 2025.<\/a><\/p>\n<p>In addition to the public aspects of Ontario Place, Therme Canada is building a new waterpark and wellness facility on the West Island. Its <a rel=\"noopener nofollow\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2025\/07\/updated-design-for-ontario-place-west-island-unveiled-by-therme-canada\" target=\"_blank\">designs were unveiled in July<\/a> last year.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2026\/05\/new-billion-dollar-plus-science-centre-breaks-ground-at-ontario-place\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] TORONTO\u00a0\u2014 The provincial government has officially broken ground on the new Ontario Science Centre, one of the key components &#8230; <a title=\"New billion-dollar-plus science centre breaks ground at Ontario place\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/new-billion-dollar-plus-science-centre-breaks-ground-at-ontario-place\/\" aria-label=\"Read more about New billion-dollar-plus science centre breaks ground at Ontario place\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-35545","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35545"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35545\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}