{"id":35585,"date":"2026-05-29T07:09:17","date_gmt":"2026-05-29T14:09:17","guid":{"rendered":"https:\/\/essential.construction\/news\/hs2-puts-1bn-interim-assets-safeguarding-works-job-on-radar\/"},"modified":"2026-05-29T07:09:17","modified_gmt":"2026-05-29T14:09:17","slug":"hs2-puts-1bn-interim-assets-safeguarding-works-job-on-radar","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/hs2-puts-1bn-interim-assets-safeguarding-works-job-on-radar\/","title":{"rendered":"HS2 puts \u00a31bn interim assets safeguarding works job on radar"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-508598\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The proposed Interim Maintenance Contracts are expected to be worth \u00a31bn over 10 years from December 2027 through to the end of 2037.<\/p>\n<p>The move reflects changes emerging from the Government\u2019s HS2 reset programme and will create a dedicated capability to manage infrastructure handed over by the main works civils contractors before the High-Speed Rail Systems teams mobilise.<\/p>\n<p>Core duties will cover land management, environmental and landscape maintenance, temporary facilities management and civil engineering infrastructure upkeep.<\/p>\n<p>The contracts will also include security services, principal contractor duties and wider infrastructure safeguarding responsibilities.<\/p>\n<p>HS2 is also expecting to instruct additional works covering landscape design, planted plot creation and localised civils construction activities.<\/p>\n<p>The company is now seeking feedback from the market on delivery models, commercial structures, consortium arrangements and risk allocation before finalising its procurement strategy. <a rel=\"noopener nofollow\" href=\"https:\/\/www.smartsurvey.co.uk\/s\/HS2IMC1\/\" target=\"_blank\">Click here<\/a> for survey.<\/p>\n<p>An engagement exercise closes on 10 June, with a formal tender notice currently expected in November 2026.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/05\/29\/hs2-puts-1bn-interim-assets-safeguarding-works-job-on-radar\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The proposed Interim Maintenance Contracts are expected to be worth \u00a31bn over 10 years from December 2027 through to &#8230; <a title=\"HS2 puts \u00a31bn interim assets safeguarding works job on radar\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/hs2-puts-1bn-interim-assets-safeguarding-works-job-on-radar\/\" aria-label=\"Read more about HS2 puts \u00a31bn interim assets safeguarding works job on radar\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-35585","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35585"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35585\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}