{"id":35637,"date":"2026-06-02T19:19:30","date_gmt":"2026-06-03T02:19:30","guid":{"rendered":"https:\/\/essential.construction\/news\/bazis-proposes-side-by-side-midtown-residential-towers\/"},"modified":"2026-06-02T19:19:30","modified_gmt":"2026-06-03T02:19:30","slug":"bazis-proposes-side-by-side-midtown-residential-towers","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/bazis-proposes-side-by-side-midtown-residential-towers\/","title":{"rendered":"Bazis Proposes Side-by-Side Midtown Residential Towers"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/development\" target=\"_blank\">DEVELOPMENT<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/planning\" target=\"_blank\">PLANNING<\/a><\/span><br \/><span id=\"article_info\">June 02, 2026 <span class=\"article-author\">by Anthony Teles<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329498\" alt=\"-\">\u00a0558\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Bazis Proposes Side-by-Side Midtown Residential Towers<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bazis.7643\" target=\"_blank\">Bazis<\/a> is seeking zoning permission to replace a Dollarama property and neighbouring retail plaza with two adjacent mixed-use condominium towers on the west side of Mount Pleasant Road just south of Eglinton Avenue East. Designed by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rosario-roy-varacalli.8054\" target=\"_blank\">Rosario \u201cRoy\u201d Varacalli<\/a>, the proposals call for a 36-storey building at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/732-mt-pleasant-road.61074\" target=\"_blank\">732 Mount Pleasant Road<\/a> and a 56-storey building at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/750-mt-pleasant-road.45664\" target=\"_blank\">750 Mount Pleasant Road<\/a>, within a short walk of\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/eglinton-line-5-mount-pleasant-station.9848\" target=\"_blank\">Mount Pleasant station<\/a> on\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/eglinton-line-5.47725\" target=\"_blank\">Eglinton Line 5<\/a>.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198395.jpg\" data-entity-uuid=\"insert-display_default-f1f46454-43ce-4c78-a38f-19c19e93455f\" data-entity-type=\"file\" alt=\"732 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Looking southwest to 732 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198395.jpg', true, 'Looking southwest to 732 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Looking southwest to 732 Mt Pleasant Road, designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">Filed as separate rezoning applications, the side-by-side projects form part of a broader block planning exercise in an area experiencing rapid densification. The submissions arrive as discussions continue between Bazis, the Toronto District School Board (TDSB), and Toronto Lands Corporation regarding the potential future redevelopment and expansion of Eglinton Junior Public School, which has faced capacity pressures amid significant residential growth in the Yonge-Eglinton area. The applications add to a growing cluster of approved and proposed towers surrounding Mount Pleasant station.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198399.jpg\" data-entity-uuid=\"insert-display_default-3551606b-a77a-40dc-acd3-b491b4d395f5\" data-entity-type=\"file\" alt=\"750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Looking southwest to 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198399.jpg', true, 'Looking southwest to 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Looking southwest to 750 Mt Pleasant Road, designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">The properties are within the Mount Pleasant West neighbourhood and Yonge-Eglinton Secondary Plan area, where a traditional low-rise commercial strip is increasingly giving way to higher-density redevelopment. The southern application concerns 732 Mount Pleasant Road, a 1,560m\u00b2 property occupied by a single-storey Dollarama building with surface parking behind it.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198404.jpg\" data-entity-uuid=\"insert-display_default-0178a03c-ee3e-417a-871d-ebae7f5ff704\" data-entity-type=\"file\" alt=\"732 Mt Pleasant Road, Toronto, Google Maps\" title=\"Looking southwest to the current site for 732 Mt Pleasant Road, image retrieved from Google Maps\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198404.jpg', true, 'Looking southwest to the current site for 732 Mt Pleasant Road, image retrieved from Google Maps'); return false;\"><span class=\"image-description\">Looking southwest to the current site for 732 Mt Pleasant Road, image retrieved from Google Maps<\/span><\/p>\n<p dir=\"ltr\">Immediately north, the larger 2,339m\u00b2 750 Mount Pleasant Road site (comprised of 744 through 758 Mount Pleasant Road) is occupied by a single-storey retail plaza set behind a surface parking lot. The property is directly south of Eglinton Junior Public School.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198405.jpg\" data-entity-uuid=\"insert-display_default-8e6ecf68-7fea-4d2a-b619-1314659ab426\" data-entity-type=\"file\" alt=\"750 Mt Pleasant Road, Toronto, Google Maps\" title=\"Looking southwest to the current site at 750 Mt Pleasant Road, image retrieved from Google Maps\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198405.jpg', true, 'Looking southwest to the current site at 750 Mt Pleasant Road, image retrieved from Google Maps'); return false;\"><span class=\"image-description\">Looking southwest to the current site at 750 Mt Pleasant Road, image retrieved from Google Maps<\/span><\/p>\n<p dir=\"ltr\">Unlike its northern neighbour, 732 Mount Pleasant Road has not been the subject of a previous major redevelopment approval. The current rezoning application was submitted concurrently with the proposal for 750 Mount Pleasant Road, with planning materials indicating the tower&#8217;s positioning and massing were coordinated to achieve appropriate separation distances.<\/p>\n<p dir=\"ltr\">The 750 site has a more extensive planning history. In July 2021, Bazis submitted a rezoning application proposing a 35-storey mixed-use building. City Council approved the proposal in July 2022, permitting a 125.94m-tall building containing 487 residential units and approximately 32,300m\u00b2 of Gross Floor Area (GFA). The approval included community benefits, public realm improvements, a publicly accessible mid-block pedestrian connection, and provisions encouraged coordination with the TDSB and neighbouring landowners. The current application replaces that approved proposal with a substantially larger one thet reflects updated growth policies.<\/p>\n<p dir=\"ltr\">At 732 Mount Pleasant Road, Bazis proposes a 36-storey mixed-use building rising 124m. The building would consist of a four-storey podium supporting a 32-storey tower with an approximately 834m\u00b2 floor-plate and retail frontage at grade.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198401.jpg\" data-entity-uuid=\"insert-display_default-a1aed6c0-f8a0-4920-884d-e8a8a08a31e9\" data-entity-type=\"file\" alt=\"Site plan, 750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Site plan, 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198401.jpg', true, 'Site plan, 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Site plan, 750 Mt Pleasant Road, designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">The proposal contains 27,585m\u00b2 of GFA, including 27,520m\u00b2 of residential space and 65m\u00b2 of retail space, resulting in a Floor Space Index (FSI) of 17.7 times coverage of the site. A total of 396 condominium units are proposed, comprising 244 one-bedroom, 112 two-bedroom, and 40 three-bedroom units, with 12 one-bedroom suites designed for future conversion to larger layouts. The building would be served by five elevators, equating to approximately one elevator for every 79 units, indicating good response times.<\/p>\n<p dir=\"ltr\">Residents would have access to 1,584m\u00b2 of amenity space, including 1,134m\u00b2 indoors and 450m\u00b2 outdoors. Two underground parking levels would accommodate 27 resident parking spaces and five visitor spaces, supplemented by a pick-up and drop-off space. Bicycle facilities would include 356 spaces, comprising 302 long-term and 54 short-term spaces, along with a bicycle repair station.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198393.jpg\" data-entity-uuid=\"insert-display_default-9d6096ff-e34f-47f0-8f6e-5cc24cc108c2\" data-entity-type=\"file\" alt=\"Ground floor plan, 732 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Ground floor plan, 732 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198393.jpg', true, 'Ground floor plan, 732 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Ground floor plan, 732 Mt Pleasant Road, designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">\u00a0<\/p>\n<p dir=\"ltr\">At the neighbouring 750 Mount Pleasant Road site, Bazis proposes a substantially taller 56-storey mixed-use tower reaching 185m. The building would rise from a four-storey podium containing retail, topped by a tower with an approximately 834m\u00b2 floor-plate. Compared with the 2022 approval, the tower has been shifted northward to create better separation distance from the proposed tower immediately to the south.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198401.jpg\" data-entity-uuid=\"insert-display_default-a1aed6c0-f8a0-4920-884d-e8a8a08a31e9\" data-entity-type=\"file\" alt=\"Site plan, 750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Site plan, 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198401.jpg', true, 'Site plan, 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Site plan, 750 Mt Pleasant Road, designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">The revised proposal would deliver 42,159m\u00b2 of GFA, including 42,094m\u00b2 devoted to residential uses and 65m\u00b2 of retail space, resulting in an FSI of approximately 18.0 times site coverage. The building would contain 618 condominium units, including 392 one-bedroom units, 164 two-bedroom units, and 62 three-bedroom units, with 42 one-bedroom suites designed for future conversion to larger family-oriented layouts. Five elevators would serve the building, resulting in an elevator-to-unit ratio of roughly one cab for every 124 units indicating potentially long wait times unless particularly high speed motors are acquired.<\/p>\n<p dir=\"ltr\">Amenity offerings would total 2,472m\u00b2, including 2,090m\u00b2 indoors and 382m\u00b2 outdoors. Parking would be provided within two underground garage levels containing 67 resident spaces and eight visitor spaces, complemented by a pick-up and drop-off area. A total of 368 bicycle parking spaces are proposed, including 306 long-term and 62 short-term spaces.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198398.jpg\" data-entity-uuid=\"insert-display_default-6b7bff7b-f579-4729-9301-8c70e7030c5d\" data-entity-type=\"file\" alt=\"Ground floor plan, 750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Ground floor plan, 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198398.jpg', true, 'Ground floor plan, 750 Mt Pleasant Road, designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Ground floor plan, 750 Mt Pleasant Road, designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">The redevelopment proposals arrive during ongoing discussions between Bazis, Toronto Lands Corporation, and the TDSB regarding the future of Eglinton Junior Public School at 223 Eglinton Avenue East. In October 2024, Toronto Lands Corporation approved amendments to a previously negotiated land exchange framework with Bazis that would increase the size of a proposed replacement school from approximately 120,000ft\u00b2 to 145,000ft\u00b2. The revised agreement would require Bazis to fund the Board&#8217;s advocate architect and establish timelines intended to deliver a completed replacement school by 2035 under the preferred scenario.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198392.jpg\" data-entity-uuid=\"insert-display_default-c10bda0c-aaaf-46b6-bfb6-91eb26ceb8a1\" data-entity-type=\"file\" alt=\"732 Mt Pleasant Road and 750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Massing perspective looking northeast to 732 Mt Pleasant Road (right) and 750 Mt Pleasant Road (left), designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198392.jpg', true, 'Massing perspective looking northeast to 732 Mt Pleasant Road (right) and 750 Mt Pleasant Road (left), designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Massing perspective looking northeast to 732 Mt Pleasant Road (right) and 750 Mt Pleasant Road (left), designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">While those discussions concern separate lands and are not part of the current rezoning applications, they remain an important backdrop to development activity in the area. Planning materials note that TDSB pupil yield figures were still being finalized as recently as March, 2026.\u00a0<\/p>\n<p dir=\"ltr\">Between the two proposals, a proposed mid-block connection would extend westward toward Brownlow Avenue, providing a pedestrian relationship with the school lands to the north. The image below, combined by UrbanToronto from renderings that were produced from the same vantage point and which were submitted separately for the adjacent proposals, looks west to the green space between the two buildings indicating where the mid-block pedestrian connection would be.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198397.jpg\" data-entity-uuid=\"insert-display_default-966de450-b003-4dc2-a4f4-55b7074e7e8a\" data-entity-type=\"file\" alt=\"Podiums, 732 Mt Pleasant Road and 750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Looking west to the podiums for 732 Mt Pleasant Road (left) and 750 Mt Pleasant Road (right), designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198397.jpg', true, 'Looking west to the podiums for 732 Mt Pleasant Road (left) and 750 Mt Pleasant Road (right), designed by Rosario &quot;Roy&quot; Varacalli for Bazis'); return false;\"><span class=\"image-description\">Looking west to the podiums for 732 Mt Pleasant Road (left) and 750 Mt Pleasant Road (right), designed by Rosario &#8220;Roy&#8221; Varacalli for Bazis<\/span><\/p>\n<p dir=\"ltr\">To provide a better sense of the potential built form should both applications receive approval and be built as proposed, UrbanToronto used Google Gemini to create composite images combining the renderings submitted for the adjacent submissions:<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198402.jpg\" data-entity-uuid=\"insert-display_default-b279fb0f-b37e-48ee-9eb3-2093e62a9e42\" data-entity-type=\"file\" alt=\"732 Mt Pleasant Road and 750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Looking northwest to 732 Mount Pleasant Road (front) and 750 Mount Pleasant Road (back), image generated via Google Gemini\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198402.jpg', true, 'Looking northwest to 732 Mount Pleasant Road (front) and 750 Mount Pleasant Road (back), image generated via Google Gemini'); return false;\"><span class=\"image-description\">Looking northwest to 732 Mount Pleasant Road (front) and 750 Mount Pleasant Road (back), image generated via Google Gemini<\/span><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198403.jpg\" data-entity-uuid=\"insert-display_default-8160233f-3849-45b9-ad35-3739f12d7413\" data-entity-type=\"file\" alt=\"732 Mt Pleasant Road and 750 Mt Pleasant Road, Toronto, designed by Rosario &quot;Roy&quot; Varacalli for Bazis\" title=\"Looking southwest to 750 Mount Pleasant Road (front) and 732 Mt Pleasant Road (back), Toronto, image generated via Google Gemini\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198403.jpg', true, 'Looking southwest to 750 Mount Pleasant Road (front) and 732 Mt Pleasant Road (back), Toronto, image generated via Google Gemini'); return false;\"><span class=\"image-description\">Looking southwest to 750 Mount Pleasant Road (front) and 732 Mt Pleasant Road (back), Toronto, image generated via Google Gemini<\/span><\/p>\n<p dir=\"ltr\">Both sites benefit from strong transit connectivity within the Mount Pleasant Protected Major Transit Station Area. Mount Pleasant station is located roughly 100m to 170m from the properties. Eglinton station, which provides access to Line 1 as well as Line 5, is approximately 650m to the west. Surface transit service is also available on the two main streets here. Cycling infrastructure includes raised cycle tracks along Eglinton Avenue East and the signed cycling route on Broadway Avenue, which connects to the Kay Gardiner Beltline Trail and Sunnybrook Park Trail.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198394.jpg\" data-entity-uuid=\"insert-display_default-f36e8442-8396-41c7-b275-9686b8992419\" data-entity-type=\"file\" alt=\"Aerial view 732 Mt Pleasant Road, Toronto\" title=\"An aerial view of the current site and surrounding area for 732 Mt Pleasant Road, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198394.jpg', true, 'An aerial view of the current site and surrounding area for 732 Mt Pleasant Road, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">An aerial view of the current site and surrounding area for 732 Mt Pleasant Road, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">The proposals join a growing concentration of high-rise development activity. Nearby projects include the proposed 27-storey\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/733-mount-pleasant-road.34865\" target=\"_blank\">733 Mount Pleasant Road<\/a> to the east, the 61-storey\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/808-mt-pleasant.29946\" target=\"_blank\">808 Mount Pleasant Road<\/a> to the north, and the proposed 60- and 65-storey towers at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/245-eglinton-avenue-east.59072\" target=\"_blank\">245 Eglinton Avenue East<\/a>. Additional applications include the 21-storey\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/181-eglinton-avenue-east.57911\" target=\"_blank\">181 Eglinton Avenue East<\/a> and 52-storey\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/191-eglinton-east.49094\" target=\"_blank\">191 Eglinton Avenue East<\/a> to the northwest, the 21-storey\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/briton-house-expansion.30110\" target=\"_blank\">Briton House expansion<\/a> and 45-storey\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/226-soudan-avenue.57543\" target=\"_blank\">226 Soudan Avenue<\/a> to the south, and the proposed 60-storey\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/54-brownlow.55746\" target=\"_blank\">54 Brownlow Avenue<\/a> and 55- and 60-storey towers at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/61-brownlow.46065\" target=\"_blank\">61 Brownlow Avenue<\/a> to the west.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198400.jpg\" data-entity-uuid=\"insert-display_default-85d0df0f-a4f2-4d63-bce5-c08c2d7bfc54\" data-entity-type=\"file\" alt=\"Aerial view, 750 Mt Pleasant Road, Toronto\" title=\"An aerial view of the current site and surrounding area for 750 Mt Pleasant Road, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/06\/61098\/61098-198400.jpg', true, 'An aerial view of the current site and surrounding area for 750 Mt Pleasant Road, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">An aerial view of the current site and surrounding area for 750 Mt Pleasant Road, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on these developments, but in the meantime, you can learn more about them from our Database files, linked below. If you&#8217;d like, you can join in on the conversations in the associated Project Forum threads or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329498\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/06\/bazis-proposes-side-side-midtown-residential-towers.61098\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] DEVELOPMENT\u00a0PLANNINGJune 02, 2026 by Anthony Teles\u00a0\u00a0\u00a0558\u00a0 Bazis Proposes Side-by-Side Midtown Residential Towers Bazis is seeking zoning permission to replace &#8230; <a title=\"Bazis Proposes Side-by-Side Midtown Residential Towers\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/bazis-proposes-side-by-side-midtown-residential-towers\/\" aria-label=\"Read more about Bazis Proposes Side-by-Side Midtown Residential Towers\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-35637","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35637","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=35637"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/35637\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=35637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=35637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=35637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}