{"id":4571,"date":"2021-04-08T17:07:04","date_gmt":"2021-04-09T00:07:04","guid":{"rendered":"https:\/\/www.daily.construction\/?p=4571"},"modified":"2021-04-08T17:07:04","modified_gmt":"2021-04-09T00:07:04","slug":"designing-lab-workspaces-in-the-time-of-covid","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/designing-lab-workspaces-in-the-time-of-covid\/","title":{"rendered":"Designing lab workspaces in the time of COVID"},"content":{"rendered":"<div class=\"field field-name-body field-type-text-with-summary field-label-hidden\">\n<div class=\"field-items\">\n<div class=\"field-item even\">\n<p>\n\tCOVID-19 initially brought major disruptions to lab operations and staffing. Those disruptions are now often mitigated through split staffing shifts and increased distancing protocols in lab space. Occupancy of research workstations and office areas has not yet recovered, however, and reflects the difficulties across industries in bringing staff back safely to the office. Office users in life sciences organizations will eventually reclaim a desk \u2013 full time or part time \u2013 but space planning for those users will begin to see a change.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"sharethis-buttons\">\n<div class=\"sharethis-wrapper\"><span class=\"st_facebook&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_twitter&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_linkedin&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_pinterest&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_plusone&amp;quot;_large\"><\/span><br \/>\n<span class=\"st_fblike&amp;quot;_large\"><\/span>\n<\/div>\n<\/div>\n<div class=\"social-share clearfix\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>COVID-19 initially brought major disruptions to lab operations and staffing. Those disruptions are now often mitigated through split staffing shifts &#8230; <a title=\"Designing lab workspaces in the time of COVID\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/designing-lab-workspaces-in-the-time-of-covid\/\" aria-label=\"Read more about Designing lab workspaces in the time of COVID\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":646,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[459],"tags":[],"class_list":["post-4571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bdc-network","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/4571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=4571"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/4571\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/646"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=4571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=4571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=4571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}