{"id":4738,"date":"2021-04-17T17:20:18","date_gmt":"2021-04-18T00:20:18","guid":{"rendered":"https:\/\/www.daily.construction\/?p=4738"},"modified":"2021-04-17T17:20:18","modified_gmt":"2021-04-18T00:20:18","slug":"speed-core-wall-system-is-used-for-the-second-time-in-office-building-in-san-jose","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/speed-core-wall-system-is-used-for-the-second-time-in-office-building-in-san-jose\/","title":{"rendered":"Speed Core wall system is used for the second time in office building in San Jose"},"content":{"rendered":"<div class=\"field field-name-body field-type-text-with-summary field-label-hidden\">\n<div class=\"field-items\">\n<div class=\"field-item even\">\n<p>\n\tA 19-story building under construction in San Jose, Calif., will be the second in the country to be built with a concrete-filled composite plate shear wall system, which was first used successfully two years ago for construction of the 58-story Rainer Square tower in Seattle.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"sharethis-buttons\">\n<div class=\"sharethis-wrapper\"><span class=\"st_facebook&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_twitter&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_linkedin&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_pinterest&amp;amp;amp;quot;_large\"><\/span><br \/>\n<span class=\"st_plusone&amp;quot;_large\"><\/span><br \/>\n<span class=\"st_fblike&amp;quot;_large\"><\/span>\n<\/div>\n<\/div>\n<div class=\"social-share clearfix\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>A 19-story building under construction in San Jose, Calif., will be the second in the country to be built with &#8230; <a title=\"Speed Core wall system is used for the second time in office building in San Jose\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/speed-core-wall-system-is-used-for-the-second-time-in-office-building-in-san-jose\/\" aria-label=\"Read more about Speed Core wall system is used for the second time in office building in San Jose\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":646,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[459],"tags":[],"class_list":["post-4738","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bdc-network","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/4738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=4738"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/4738\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/646"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=4738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=4738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=4738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}