{"id":6841,"date":"2022-01-15T06:11:17","date_gmt":"2022-01-15T14:11:17","guid":{"rendered":"https:\/\/essential.construction\/news\/?p=6841"},"modified":"2022-01-15T06:11:17","modified_gmt":"2022-01-15T14:11:17","slug":"a-study-on-hvac-and-electrical-installation-productivity","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/a-study-on-hvac-and-electrical-installation-productivity\/","title":{"rendered":"A Study on HVAC and Electrical Installation Productivity"},"content":{"rendered":"<p class=\"itemsource\">This item was originally posted here: <a href=\"https:\/\/aec-business.com\/a-study-on-hvac-and-electrical-installation-productivity\/\" target=\"_blank\" class=\"feedzy-rss-link-icon\" rel=\"noopener nofollow\">Read More<\/a><\/p>\n<p>A recently published Aalto University research report (in Finnish) looks at waste in HVAC and electrical installations. The project measured the amount of non-value-adding time, i.e., waste, investigated its root causes, and developed ways to improve productivity.<\/p>\n<p>The researchers studied four Finnish construction sites. They collected data with hardhat video cameras, indoor positioning technology, interviews, and surveys.<\/p>\n<h2>Unnecessary hurdles<\/h2>\n<p>The report paints an alarming picture of construction efficiency. The HVAC and electrical installation teams face challenges that make it almost impossible to be productive.<\/p>\n<p>The designs do not consider constructability, the general contractor\u2019s plans and schedules are superficial, the necessary information and communication are lacking, etc.<\/p>\n<p>No wonder HVACE workers used barely 20% of their work time for actual installations. They spent 18% of their time on entirely non-value-adding tasks. Of the remaining 62%, many of the activities resulted from poor communication, impaired logistics, and unnecessary movement.<\/p>\n<p>The following graph breaks down the workers\u2019 time for various activities during the research period.<\/p>\n<h2>Tactics for a better future<\/h2>\n<p>The researchers suggested several tactics to improve productivity. A fundamental improvement would be to let those doing the installations participate in planning and design.<\/p>\n<p>Second, a logistics service should provide workers with material kits delivered on time to the exact location of the assembly. All the materials on the site should be stored \u201con wheels.\u201d<\/p>\n<p>Third, the use of HVAC prefabrication should increase, as is the case in the USA, UK, and Australia. Based on research done in the USA, prefabrication could improve productivity by 25%.<\/p>\n<p>The researchers also highlight the benefits of takt production. It enforces better planning and coordination of work and makes deviations visible at once.<\/p>\n<p>Finally, they remind us of the value of effective communication and how digital systems and tools can help the workers plan and manage their work and collaborate better.<\/p>\n<p><em>You can read the report in Finnish at <a href=\"https:\/\/www.aalto.fi\/sites\/g\/files\/flghsv161\/files\/2021-12\/TATE-jarjestelmat-loppuraportti-2021-12-02.pdf\" target=\"_blank\" rel=\"noopener nofollow\">aalto.fi.<\/a><\/em><\/p>\n<p><a href=\"https:\/\/aec-business.com\/subscribe-to-aec-business-bulletin\/\" rel=\"nofollow noopener\" target=\"_blank\">Subscribe to the AEC Business Newsletter<\/a> to read more about construction technology.<\/p>","protected":false},"excerpt":{"rendered":"<p>This item was originally posted here: Read More A recently published Aalto University research report (in Finnish) looks at waste &#8230; <a title=\"A Study on HVAC and Electrical Installation Productivity\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/a-study-on-hvac-and-electrical-installation-productivity\/\" aria-label=\"Read more about A Study on HVAC and Electrical Installation Productivity\">Read more<\/a><\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1062,1066],"tags":[],"class_list":["post-6841","post","type-post","status-publish","format-standard","hentry","category-aec-business","category-all-posts","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/6841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=6841"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/6841\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=6841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=6841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=6841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}