How to safely remove asbestos

This Code of Practice on how to safely remove asbestos is an approved code of practice under section 274 of the Work Health and Safety Act (the WHS Act).

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Download FREE!

To download How to safely remove asbestos today just enter your email address!

Contributor
builderkp
Document Type
Document
Language
N/A
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

There are a number of duty holders who have a role in managing risks associated with removal of asbestos and ACM at the workplace. These include:
โˆ’ persons conducting a business or undertaking (PCBU)
โˆ’ designers, manufacturers, importers, suppliers and installers of plant, substances or
structures, and
โˆ’ officers.

Workers and other persons at the workplace also have duties under the WHS Act, such as the duty to take reasonable care for their own health and safety at the workplace.ย A person can have more than one duty and more than one person can have the same duty at the same time.

Early consultation and identification of risks can allow for more options to eliminate or minimise risks and reduce the associated costs.

SKU: 20210731A Categories: , Tags: , , , ,

Reviews

There are no reviews yet

Be the first to review “How to safely remove asbestos”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Guides, Safety

Accident Reporting Form
Construction project startup checklist template
Construction Startup Checklist
Construction safety meeting - glazing
Construction Safety Meeting – Glazing
Scaffold Inspection Checklist Template
Bridge and Gantry Crane Information Sheet

More products by builderkp

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block