Work Permit – Permit To Lift
$4.99
Use this quality checklist to ensure that all of the components of your crane lift are in place prior to your pick.
LOVE THIS ITEM?
Download For Free
Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.
Start Your 14-Day Free TrialTemplates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.
Product FAQ
You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.
As long as the document remains on Essential Construction you will be able to download it once purchased.
Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.
We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.
Our return policy varies based on the product, for more information you can find our detailed return policy here.
Our documents are for use on your projects. You may not resell these documents on other marketplaces.
Full Description
This lifting permit is a permit to lift template for crane lifts on construction sites. Use it to confirm that the crane, the supporting structure, the lifting gear and the load have all been checked before the pick, and that every lift on your jobsite follows your site rules and the regulations that apply to you.
What is a lifting permit?
A lifting permit, or permit to lift, is a written authorization that must be completed and signed before a crane lift goes ahead. It records the details of the lift, including the crane, its setup and supporting ground or structure, the rigging and lifting devices, and the load, and confirms that each item has been checked by a competent person. It is part of a permit-to-work system and gives the supervisor a clear hold point before a high-risk activity starts.
When to use it
- Before any planned crane lift on site, mobile or tower
- For heavy, awkward or high-value loads such as steel, precast, plant and equipment
- When a crane is set up on a slab, near an excavation or on ground of unknown capacity
- Lifts near power lines, occupied areas, public roads or other cranes
- When a new crane, operator or rigging crew starts on the project
- Whenever your site rules or the client’s procedures require a permit for lifting
What’s included
The download is an editable Word document (.docx). The form includes checklist items for:
- Details of the crane
- Supporting structure details
- Components of the lifting device
- Loading details
It also includes further checks you can adapt to your own permit system.
How to fill it out
- Fill in the job, location, date and the planned time of the lift.
- Record the crane details and confirm the crane’s inspection and documentation are current.
- Describe the supporting structure or ground under the crane and outriggers, and confirm it has been checked.
- List the lifting device and rigging components, and confirm each is inspected, tagged and rated for the load.
- Enter the load details, such as weight, dimensions and lifting points, and check them against the crane’s capacity for the planned radius.
- Confirm exclusion zones, communication method and weather limits with the crew.
- Have the supervisor and the people named on the permit sign before the lift, and close the permit when the lift is complete.
Common mistakes to avoid
- Guessing the load weight instead of confirming it from drawings, delivery notes or the manufacturer
- Signing the permit after the lift has started
- Ignoring ground conditions under outriggers
- Reusing one permit for lifts with different loads or crane positions
Related templates and guides
- Critical Lift Permit
- Work Permit โ Mobile Crane Setup
- Lifting Device Construction Checklist
- Daily Safety Inspection โ Crane
- How To Plan Your Next Construction Crane Lift
Frequently asked questions
What is a crane lifting permit?
It is a site permit that authorizes a specific crane lift. It confirms that the crane, setup, rigging and load have been checked, that the lift is within the crane’s capacity, and that the right people have signed off before the load leaves the ground.
Is a lifting permit the same as a lift plan?
Not quite. A lift plan describes how the lift will be done: crane position, radius, capacity, rigging and sequence. A lifting permit is the sign-off that the plan and checks are in place on the day. Many sites use both, especially for critical lifts.
Are crane lift plans required by OSHA?
Federal OSHA rules for cranes in construction call for specific planning in some situations, such as multiple-crane lifts and hoisting personnel. Many owners and contractors require a written lift plan or permit for every critical lift. Check your site rules and the regulations where you work.
Who signs a permit to lift?
Usually the lift supervisor or appointed person, the crane operator and the rigger or signal person, with the site supervisor authorizing the permit. Your permit-to-work procedure should say exactly who can issue, accept and close each permit.
What makes a lift a critical lift?
Definitions vary by company and site, but critical lifts commonly include loads near the crane’s rated capacity, lifts using more than one crane, lifting people, and lifts over occupied areas or near power lines. These usually need a more detailed plan and permit.