Construction site logistics checklists and logs for setting up and running a jobsite: site setup, crane and batch plant checks, scaffolding tracking, vehicle fleet and equipment inspections, and emergency evacuation. Built for superintendents, site managers and logistics coordinators who need deliveries, access, equipment and storage organized so the work flows safely.
Site logistics is how people, materials and equipment move on and around the jobsite. The documents cover:
Site setup: fencing, access points, site offices, welfare facilities, laydown and storage areas.
Lifting and plant: mobile crane and batch plant checklists.
Access equipment: scaffolding tracking logs and related work permits.
Vehicles and tools: weekly fleet checklists and tools and equipment inspection logs.
Emergencies: evacuation checklists, first aid kits and fire extinguishers.
Superintendents prepare the logistics plan before mobilization and revise it at each phase, such as excavation, structure and enclosure. Site staff use the checklists and logs to confirm the plan is followed day to day.
What should a construction site logistics plan include?
Most plans show site boundaries and fencing, gates and access routes, crane and hoist locations, laydown and storage areas, delivery times and routes, parking, site offices and welfare facilities, temporary services, waste areas, pedestrian routes and emergency assembly points.
Who prepares the site logistics plan?
The general contractor usually prepares it, led by the superintendent or project manager, with input from the crane supplier, key trades and sometimes the local authority for street use. It should be updated whenever the site layout changes between phases.
What is the difference between a logistics plan and a logistics checklist?
The plan is the drawing and narrative showing how the site is arranged. The checklist is used to confirm that each element is actually in place and working, for example at site setup or during a weekly walk.
Are these logistics templates editable?
They are designed to be filled in and adapted to your site, phases and equipment list. File type varies by product, so check the format listed on each product page before downloading.