Lifting Permit

$4.99

The lifting permit template is used to gather all information necessary prior to the start of lifting operations.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
essentialvendor
Document Type
Document
Language
N/A
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This lifting permit template is a permit to work for crane lifts on your jobsite. Before any lift, the people organizing it fill it in and submit it for approval, so the right checks are in place and only qualified people carry out the work.

What is a lifting permit?

A lifting permit is a permit to work that must be completed and approved before a crane lift starts. It gathers the key information about the lift in one place: what is being lifted, where, with which equipment and by whom. It also confirms that the lift has been planned, the crane and rigging are suitable and the area is controlled. The permit gives the site supervisor a clear point to stop and check before a high-risk activity goes ahead.

When to use it

  • Before any crane lift on site, if your safety plan requires a permit
  • Lifting heavy or unusual loads such as steel, precast or plant
  • Lifts close to people, live roads, power lines or occupied buildings
  • Tandem lifts or lifts involving more than one crane
  • When a new crane, operator or rigging crew starts on the project

What’s included

The permit is a Word document (.docx) that you can edit to match your site rules. It is set up to gather all of the information needed before lifting operations with a crane start, and to record that the lift has been submitted and approved before work begins.

How to fill it out

  1. Describe the lift: the load, its weight, the pick-up and set-down locations and the date and time.
  2. Record the crane and lifting gear to be used, and check they are suitable and inspected.
  3. Name the crane operator, signaler or banksman and riggers, and confirm they are qualified.
  4. Attach or reference the lift plan, including radius, capacity and ground conditions.
  5. List the controls, such as exclusion zones, barriers, weather limits and communication method.
  6. Submit the permit to the approving supervisor and do not start the lift until it is signed.
  7. Close the permit when the lift is complete and file it with your site safety records.

Tips

  • Hold a short pre-lift briefing with everyone involved, using the permit as the checklist.
  • Set clear wind speed limits and stop work if they are exceeded.
  • Never let a permit be signed by the same person who will carry out the lift without review.
  • Keep completed permits. They are useful evidence in audits and investigations.

Related templates and guides

Frequently asked questions

What is the difference between a lift plan and a lifting permit?

A lift plan is the technical plan for the lift: crane position, radius, load weight, rigging and capacity. A lifting permit is the approval step that confirms the plan exists, the people and equipment are ready and the area is controlled before the lift starts.

Who approves a lifting permit?

Usually a site supervisor, lifting supervisor or appointed person who is competent in crane operations. The approver should not simply sign. They should check the lift plan, the equipment and the controls before authorizing the work.

What is a critical lift?

A critical lift is a lift with higher risk, for example a load close to the crane’s rated capacity, a tandem lift, a lift over occupied areas or a lift of personnel. Each company or site sets its own criteria, and critical lifts usually need a more detailed plan and permit.

How long is a lifting permit valid?

A lifting permit is usually issued for a specific lift or a single shift. If the load, crane, location or conditions change, a new permit should be raised. Follow the validity period in your site safety plan.

When must lifting equipment be inspected?

Cranes and lifting gear should be checked by a competent person before use, and also have periodic thorough inspections at the intervals set by local regulations and the manufacturer. Record the inspections and do not use equipment that has failed a check.

SKU: FCSALPR Category: Tags: , , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

Reviews

There are no reviews yet

Be the first to review “Lifting Permit”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Safety

Construction safety meeting - fall protection
Construction Safety Meeting – Fall Protection
Construction Operations Forms – Request For Concrete Pouring
Slips Trips and Falls Safety Policy
Toolbox Foot Protection
Toolbox Talk – Foot Protection
JHSC Responsibilities Templates

More products by essentialvendor

Asphalt Paving Design Guide (Minnesota)
Asphalt Pavements Inspector’s Manual (State Of Alaska)
Formwork Health and Safety
Foundation Preparation, Removal of Water, Excavation
Competition’s Effect On Construction Bid Quality
Lifting Permit
$4.99