Caddick wins £23m Lancaster extra care homes job

Additional features such as assisted bathing, spa bathing, hairdressing facility, a games room, roof terraces and a laundry room will ...
builderkp

20220718 175041000 iOS - Caddick wins £23m Lancaster extra care homes job

Additional features such as assisted bathing, spa bathing, hairdressing facility, a games room, roof terraces and a laundry room will also be incorporated. 

AS Day UOC Day Care C02 Aerial - Caddick wins £23m Lancaster extra care homes job

Extra care facility designed by DAT Architectural and M&E engineer Futureserv

Building on Caddick’s existing healthcare portfolio, this development will boost the provision of specialist residential care for those aged 55 and over in Lancaster, providing a safe and comfortable space for those requiring varying levels of care. 

- Caddick wins £23m Lancaster extra care homes job

External work will include alterations and remodelling of the existing and stone boundary wall, landscaping, a car park with EV charging points, restoration of all historial sandstone buildings and the installation of external lighting. 

Ian Threadgold, Managing Director of Caddick Construction for the North West said the latest scheme built on a range of extra care construction projects, including the delivery of Carlisle Healthcare Centre, on behalf of United Healthcare Developments.

This scheme saw the creation of a BREEAM Outstanding development, making the building the most sustainable primary care centre in the country.

22022 UKPNS Construction Enquirer MPU V1 - Caddick wins £23m Lancaster extra care homes job
1681317299 266 002 Constructionline GIF V2 - Caddick wins £23m Lancaster extra care homes job



This article was originally posted at Source link

Leave a Comment