57-Storey Rushden Station Fourth Tower Proposed Beside Danforth GO

[ad_1] Proposed at an ambitious 57 storeys, Rushden Station Tower D could rise beside the three towers currently under construction in ...
builderkp

[ad_1]

Proposed at an ambitious 57 storeys, Rushden Station Tower D could rise beside the three towers currently under construction in the project’s first phase. Designed by bKL Architecture for Fitzrovia Real Estate Inc., this purpose-built rental tower would mark a significant height increase over a 2022 approval for 17 storeys on this lot immediately to the east. Adjacent to Danforth GO station, it is within its Major Transit Station Area where the Province now encourages more density. As well as being steps from the GO station, the site is a short walk to Main Street station on Danforth Line 2.

Looking northwest to Rushden Station, with Tower D on the right, designed by bKL Architecture for Fitzrovia Real Estate Inc

The 1.17-hectare property, lies south of Danforth Avenue, west of Dawes Road. Formerly occupied by a self-storage facility, it now serves as a construction staging area for the three towers rising to the west. The neighbouring properties are similarly converting from low-rise commercial and light industrial uses to multi-use, multi-tower high-rise developments, with retail and amenities concentrated along Danforth Avenue. To the south across the Lakeshore East rail corridor lies a low-rise residential neighbourhood.

A distant aerial view looking northwest to Rushden Station (left), the staging area for the future Tower D (centre), and construction site for The Dawes (right), image by UrbanToronto Forum contributor TwinHuey

Since the 2022 zoning approval, intensification targets and transit-oriented development policies in places like East End Toronto’s Danforth Village area have evolved. In response, Fitzrovia has proposed this height increase and submitted a Zoning By-law Amendment application to the City of Toronto for a tower standing 194.55m, a much taller than the approved height of 58.2m. The design includes an 11-storey podium and a tower floor-plate of approximately 850m². The proposal allocates 39,318m² of residential Gross Floor Area (GFA) as part of a total site-wide GFA of 119,149m², increasing the previous Floor Space Index from 8.56 to 10.14 overall lot coverage. The building would house 533 rental units, with six affordable rental units across the overall masterplan. 

Site plan, designed by bKL Architecture for Fitzrovia Real Estate Inc

The proposal includes 1,359m² of indoor amenities, located on the ground floor and levels 12 and 56, while 808m² of outdoor amenities include a podium-rooftop pool on level 12 and additional spaces on levels 39 and 56. With five elevators, or approximately one for every 107 units, high-speed motors would be required for adequate service.

Ground floor plan, designed by bKL Architecture for Fitzrovia Real Estate Inc

As the final phase of the Rushden Station masterplan, the east block would include 610m² of POPS (Privately-Owned Publicly-accessible Space) plus a 1,400m² public park. The parkland, positioned adjacent to the rail corridor, would add significant green space to the neighbourhood, while the POPS would create accessible pedestrian pathways connecting the site to the surrounding area. A new east-west public road, measuring approximately 160m in length, would run along the site’s northern edge. Additional public benefits secured through a Section 37 agreement include $7 million toward a new community recreation centre.

Looking southeast to the podium, designed by bKL Architecture for Fitzrovia Real Estate Inc

The proposal entails 53 vehicle parking spaces for residents and six for visitors spread across four above-grade podium levels, along with 587 bicycle parking spaces, including 470 long-term and 107 short-term spaces, with 10 publicly accessible spots on the new public road. The building’s single level below grade would house essential infrastructure.

Looking northeast to Rushden Station, designed by bKL Architecture for Fitzrovia Real Estate Inc

The site is about 300m (a four-minute walk) from the Danforth GO station on the Lakeshore East line and 400m (a five-minute walk) from Main Street station. Surface transit options include the Carlton streetcar on Main Street and several bus routes connecting to the subway station. Cycling infrastructure includes dedicated bike lanes on Dawes Road and Danforth Avenue linking to the east-west Massey Creek Trail, Lower Don Trail, and Bloor-Danforth cycling corridor.

An aerial view of the site and surrounding area, image from submission to City of Toronto

The surrounding area is rapidly intensifying with several high-rise projects underway or proposed. To the west, Phase 1’s towers will rise to 29, 37, and 39 storeys. Northeast, The Dawes is rising with two towers at 24 and 43 storeys. Eastward, 9 Dawes Road is proposed as two towers at 28 and 34 storeys, while 8 Dawes is planned at 52 storeys. Further northwest, 2575 Danforth Avenue proposes four towers ranging from 15 to 55 storeys. North of the site, 2681 and 2721 Danforth Avenue include proposals for four towers from 33 to 59 storeys. 

UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you’d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.

* * *

UrbanToronto has a research service, UTPro, that provides comprehensive data on development projects in the Greater Golden Horseshoe — from proposal through to completion. We also offer Instant Reports, downloadable snapshots based on location, and a daily subscription newsletter, New Development Insider, that tracks projects from initial application.​​​

Related Companies:  Bousfields, Entuitive, EQ Building Performance Inc., Fitzrovia Real Estate Inc., Gradient Wind Engineers & Scientists, Grounded Engineering Inc., Janet Rosenberg & Studio, Kramer Design Associates Limited, LEA Consulting, Mulvey & Banani, Turner Fleischer Architects



[ad_2]

This article was originally posted at Source link

Leave a Comment