QAQC Checklist – Demolition Work (Structural Removals)

$4.99

Use this structural demolition quality control checklist to check for items both before and after installation.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
English
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This demolition checklist is a quality control checklist for structural removals. It helps your team check the right items both before and after structural elements are removed, so the work matches the drawings and approvals and corners are not cut. It is a quality checklist, so use it alongside your demolition safety plan, not instead of it.

What is a structural removals QA/QC checklist?

A structural removals QA/QC checklist is a form used to confirm that the removal of structural elements, such as walls, slabs, beams or openings in existing structure, is properly prepared and correctly completed. Before work, it checks things like approvals, the marked extent of removal and the condition of the surrounding structure. After work, it checks the finished removal before the next trade builds on it. Using the same checklist on every removal gives consistent results and a record for the project quality file.

When to use it

  • Before cutting or removing any structural element in an existing building
  • When creating new openings in walls or slabs during a renovation
  • After removal is complete and before new work or making good starts
  • As part of an inspection and test plan hold point
  • During quality audits, as evidence that checks were completed

What’s included

This is a spreadsheet (.xlsx) quality control checklist for demolition work, specifically structural removals. It features over 10 items to check both before and after structural removals are completed. It is designed to be standardized and rolled out across your project, so everyone checks the same things in the same way.

How to fill it out

  1. Fill in the project, location and a description of the elements to be removed.
  2. Confirm you have the latest approved drawings and any engineer’s instructions for the removal.
  3. Go through the before-removal items and confirm each one on site.
  4. Hold the work if any item is not ready, and record what is needed to resolve it.
  5. When removal is complete, go through the after-removal items.
  6. Record any defects or damage, the corrective action and who will close it out.
  7. Sign the checklist and have it reviewed by the responsible engineer or QC lead.

Tips

  • Mark the exact extent of removal on site and check it against the drawings before cutting.
  • Confirm temporary support is in place where the design calls for it.
  • Take photos before and after removal. They help if questions come up later.
  • Keep this quality record separate from your demolition safety checks, which have a different purpose.

Related templates and guides

Frequently asked questions

Is this a demolition safety checklist?

No. This is a quality control checklist that confirms structural removals are prepared and completed correctly. Demolition safety, such as hazard assessments, exclusion zones and fall protection, needs its own plan and checklist. Most projects use both.

What should be checked before structural removal?

Typical checks include approved drawings and engineer’s instructions, the marked extent of removal, isolation of services running through the element, any required temporary support, protection of adjacent work, and a review of hazardous materials surveys for the area.

What is the difference between QA and QC in construction?

Quality assurance is the planned system for achieving quality, such as procedures, inspection plans and training. Quality control is the checking of the actual work against the requirements, such as inspections and checklists like this one.

Who should sign off a structural removal?

The contractor’s supervisor or QC lead usually completes the checklist. Where the removal affects the structure, the project’s structural engineer or the owner’s representative may also need to inspect and approve the work before it continues.

Can I add items to the checklist?

Yes. The checklist is a spreadsheet, so you can add project-specific items from the specification or the engineer’s instructions and remove items that do not apply. Keep the core items the same across the project so results stay consistent.

SKU: 2021214K Category: Tags: , , , , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

Reviews

There are no reviews yet

Be the first to review “QAQC Checklist – Demolition Work (Structural Removals)”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Quality

Work permit - hot work
Work Permit – Hot Work
Quality Checklist – Waterproofing
Construction Operations Forms - Request for Tiles Installation
Construction Operations Forms – Request for Tiles Installation
Work Permit – Post Tensioning
Road Construction Inspection Report
Road Construction Inspection Report

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
QAQC Checklist – Demolition Work (Structural Removals)
$4.99