Quality Checklist – Waterproofing
$4.99
Easy-to-use checklist and procedure that will be useful for waterproofing works.
LOVE THIS ITEM?
Download For Free
Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.
Start Your 14-Day Free TrialTemplates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.
Product FAQ
You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.
As long as the document remains on Essential Construction you will be able to download it once purchased.
Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.
We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.
Our return policy varies based on the product, for more information you can find our detailed return policy here.
Our documents are for use on your projects. You may not resell these documents on other marketplaces.
Full Description
This waterproofing inspection checklist helps contractors, site engineers and project managers check waterproofing works step by step and close out every item before the work is covered. Good checks at this stage help prevent leaks, mold and concrete damage that are expensive to fix once finishes are installed.
What is a waterproofing inspection checklist?
A waterproofing inspection checklist is a quality control form used to confirm that a waterproofing system is installed correctly. It covers the stages of the work, such as substrate preparation, materials, application, detailing at corners, drains and penetrations, and testing. Each item is checked and signed off before the waterproofing is covered by screed, tiles, backfill or other finishes. The completed checklist also becomes part of the project quality records.
When to use it
- Before waterproofing starts, to confirm the substrate is ready
- During application on wet areas, roofs, balconies, podiums, basements and pits
- Before a flood test or ponding test
- Before the membrane is covered by the next trade
- During quality audits or handover, as evidence of inspections completed
What’s included
This is a spreadsheet (.xlsx) checklist and procedure for waterproofing works. It lists the items to review before and during the work so the team can close each one out, with the aim of avoiding common problems such as mold, leaks and concrete cancer (spalling concrete caused by corroding reinforcement).
What a waterproofing inspection usually checks
The items below are general good practice. Always follow the project specification and the manufacturer’s instructions.
- Substrate is clean, dry, sound and properly sloped to drains
- Cracks, joints and corners are treated before membrane application
- Approved materials are used and stored correctly
- Membrane thickness, laps and terminations meet the specification
- Drains, pipe penetrations and upturns are reinforced and sealed
- Curing time is observed and the membrane is protected from damage
How to fill it out
- Enter the project, area or room, and the waterproofing system being installed.
- Check the approved drawings, specification and product data before inspecting.
- Inspect the substrate and record whether each preparation item is acceptable.
- Check the application items as the work progresses, not only at the end.
- Record any defects, the corrective action and who is responsible.
- Record the results of any flood or spray test.
- Sign off the checklist with the installer and the supervisor before the area is covered.
Common mistakes to avoid
- Covering the membrane before the checklist and test are signed off
- Applying waterproofing on a damp or dusty substrate
- Skipping the details at drains, corners and penetrations, where most leaks start
- Not protecting the finished membrane from other trades
Related templates and guides
- Construction Operations Forms โ Request for Waterproofing
- Construction Project Quality Checklist (250+ items)
- Waterproofing and Vapor-proofing Tile Assemblies in Showers
- Basics of Building Envelope Construction
- Controlling Quality on the Construction Site
Frequently asked questions
What should a waterproofing inspection check?
It should check substrate preparation, the approved materials, membrane thickness and coverage, laps and terminations, and the detailing at drains, corners, upturns and penetrations. It should also confirm curing time, protection of the membrane and the result of any flood or spray test before the area is covered.
What is a flood test for waterproofing?
A flood test, or ponding test, means plugging the drains and filling the waterproofed area with water for a set period, then checking below and around it for leaks. The depth and duration should follow the project specification or the membrane manufacturer’s guidance.
When should waterproofing be inspected?
Inspect before application to confirm the substrate is ready, during application to check coverage and details, and again before the membrane is covered. Leaving inspection until the end makes it hard to see problems at laps and penetrations.
What is concrete cancer?
Concrete cancer is a common term for spalling concrete caused by corroding steel reinforcement. When water reaches the steel, it rusts and expands, cracking the concrete around it. Good waterproofing helps keep water away from the reinforcement.
What is a QC checklist?
A quality control checklist is a list of items to inspect for a specific scope of work. It makes sure everyone checks the same things in the same way, records the results and closes out defects before the work moves on to the next stage.
Ask AI about this template: ChatGPT, Claude or Perplexity·Copy as Markdown
This site uses Akismet to reduce spam. Learn how your comment data is processed.












Reviews
There are no reviews yet