QAQC Checklist – Door Installation

5.00 out of 5
(1 customer review)

$4.99

Use this door installation quality control checklist to check for items both before and after the work.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
English
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This door installation checklist helps supervisors and QA/QC staff check doors both before and after they are installed. Use it on every opening so frames, hanging and hardware meet the drawings and specifications, and problems are fixed before the finishes and handover.

What is a door installation checklist?

A door installation checklist is a quality control form for the hanging and fitting of doors. Pre-installation checks confirm the door, frame, opening and hardware are correct and ready. Post-installation checks confirm the door is plumb, operates smoothly, latches, has even clearances and has all its hardware fitted. Each item is marked acceptable or not, and defects are recorded for correction and sign-off.

When to use it

  • Before doors are hung in a new area or floor
  • After installation of doors and door hardware
  • When checking a sample or mockup door before full production
  • During punch list and pre-handover inspections
  • When door hardware is changed or adjusted after installation

What’s included

The download is an Excel spreadsheet (.xlsx) quality control checklist for installing doors. It features more than 10 items, split between checks before the work and checks after the doors are installed. Use it as a standard checklist across your project so every inspection covers the same points.

How to fill it out

  1. Enter the project, area and door numbers being inspected, using the door schedule.
  2. Before installation, confirm the door type, size and handing match the schedule.
  3. Check the frame is plumb, square, level and securely anchored, and the opening is clean.
  4. Confirm the correct hardware is on site and any preparation for it is done.
  5. After installation, check clearances at the head, jambs and threshold, and that the door swings freely.
  6. Check latching, closers, stops and locks work, and that the finish is undamaged.
  7. Record defects and the responsible trade, then re-inspect and sign off.

Tips

  • Inspect frames before doors arrive. Most door problems start with a frame out of plumb.
  • Check a first-installed door with the installer to agree the standard.
  • Protect installed doors and hardware until finishes are complete.
  • Keep the door schedule at hand so handing and hardware sets can be checked on the spot.

Related templates and guides

Frequently asked questions

What should be checked before installing a door?

Confirm the door type, size and handing against the door schedule, check the frame is plumb, square and securely fixed, make sure the opening is clean and the floor finish level is known, and check that the right hardware has arrived and the door is prepared for it.

What should be checked after a door is installed?

Check that the door is plumb, swings freely without binding, latches every time, and has even clearances around the leaf. Confirm hardware such as hinges, locks, closers and stops is complete, tight and working, and that the door and frame finishes are undamaged.

What is the difference between a pre-installation and post-installation checklist?

A pre-installation checklist confirms everything is ready before work starts: materials, openings and preparation. A post-installation checklist confirms the finished work meets the specification. This checklist covers both stages in one form.

Does this checklist cover windows?

No. It is written for doors and door hardware. Windows need different checks, such as anchoring, flashing, sealing and water testing, so use a dedicated window installation checklist or add window items to your inspection and test plan.

1 review for QAQC Checklist – Door Installation

5.0
Based on 1 review
5
100
100%
4
0%
3
0%
2
0%
1
0%
  1. 5 out of 5

    Ali md Azad –

    Good

Add a review

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Quality

Weekly construction report
Project Weekly Report Template
Quality Assurance Checklist – Stone and Tile Installation
Three Week Look Ahead Schedule Template
Three Week Look Ahead Schedule Template
QAQC Checklist – Block (Masonry) Walls
Construction checklist - tower crane
Tower Crane Construction Checklist

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
QAQC Checklist – Door Installation
$4.99