QAQC Checklist – Door Frame Installation

$4.99

Use this door frame installation quality control checklist to check for items both before and after the work.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
English
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This quality control checklist for door frame installation helps your team check the right items both before and after door frames go in. A standard checklist for this scope of work can be rolled out across your project, so every installer and inspector checks the same things and corners are not cut.

What is a door frame installation checklist?

A door frame installation checklist is a quality assurance and quality control (QA/QC) form used to inspect door frames before and after they are installed. Before installation, it confirms the opening, wall type and delivered frames match the drawings and door schedule. After installation, it confirms the frames are set plumb, level and square, properly anchored and protected. Signing off frames before walls are finished and doors are hung prevents costly rework later.

When to use it

  • Before frames are set, to check openings, rough bucks and wall framing
  • When frames are delivered, to check sizes, handing and fire labels against the door schedule
  • After installation and before drywall or masonry is completed around the frame
  • Before doors and hardware are hung
  • During quality walks, mockup reviews and pre-handover inspections

What’s included

The checklist is a spreadsheet for quality control of door frame installation. It features over 10 different items to check, covering inspection both before and after the door frames are installed.

How to fill it out

  1. Enter the project, area or level, door numbers from the door schedule, date and inspector.
  2. Before installation, work through the pre-installation items and note any opening or wall issues for correction.
  3. Confirm the delivered frames match the door schedule for size, type, handing and any fire rating.
  4. After installation, work through the post-installation items, checking each frame for plumb, level, square and secure anchoring.
  5. Mark each item as pass or fail and record a clear note for every failed item.
  6. Have the installer correct defects, then re-inspect and record the close-out.
  7. Sign the checklist and file it with the project quality records.

Common mistakes to avoid

  • Inspecting only after walls are closed in, when frame problems are expensive to fix.
  • Skipping the check of fire-rated frame labels against the door schedule.
  • Leaving frames unprotected while other trades work nearby.
  • Not checking frames against hardware locations before doors are ordered or hung.

Related templates and guides

Frequently asked questions

What should be checked before installing a door frame?

Check that the rough opening or rough buck is the right size and location, the wall type and thickness match the frame, the floor is at the correct level, and the delivered frame matches the door schedule for size, type, handing and any fire rating. Fix problems before the frame is set.

What should be checked after a door frame is installed?

Check that the frame is plumb, level and square, properly anchored to the wall, at the right height relative to the finished floor, undamaged and protected from other trades. For hollow metal frames, also check any specified grouting and that hardware preparations are in the right place.

What are the main types of door frames?

Common types on commercial and residential projects include hollow metal (steel) frames, wood frames, and aluminum frames. Steel frames may be welded or knock-down types. The door schedule and specifications set which type is used at each opening and whether it must be fire rated.

Why use a QA/QC checklist for door frames?

A checklist makes every inspection consistent, creates a record that the work was checked, and catches problems before finishes and doors are installed. It also gives installers a clear standard to work to, which reduces rework and disputes at handover.

Reviews

There are no reviews yet

Be the first to review “QAQC Checklist – Door Frame Installation”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Quality

Material Approval Form – Register
Construction Hourly Timecard
Hourly Labour Timecard Template
QAQC Checklist – Wood Doors
Work Permit – Placing Boom
Work Permit – Floor and Edge Protection

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
QAQC - door frame checklist
QAQC Checklist – Door Frame Installation
$4.99