QAQC Checklist – Drywall Partitions

$4.99

Use this quality control checklist to check for items both before and after installation.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
English
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This pre drywall inspection checklist is a quality control (QA/QC) spreadsheet for drywall partitions. It helps your team check the right items after framing and before board goes up, and again after installation, so problems are caught while walls are still open and cheap to fix.

What is a pre-drywall inspection?

A pre-drywall inspection is a check of a wall or partition after framing, rough-ins and insulation are complete but before drywall is installed. It confirms that framing, blocking, services and other in-wall work are correct and complete, because once the board is on, mistakes are hidden and expensive to correct. Contractors use it as a QA/QC hold point. Homebuyers often book one on new homes before the walls are closed.

When to use it

  • After metal or wood stud framing is complete and before the first layer of board
  • Before closing walls that contain plumbing, electrical, low-voltage or HVAC rough-ins
  • For fire-rated or acoustic partitions, where hidden details matter
  • At a quality hold point agreed with the general contractor, consultant or owner
  • After installation, to check the finished drywall partition before taping and finishing are signed off

What’s included

The download is an editable spreadsheet (.xlsx) built as a predefined QA/QC checklist for drywall partitions. It includes more than 10 items to check before and after framing, and before drywall is installed. Because it is a standard checklist, you can roll it out across a project so every crew and inspector checks the same items in the same way.

How to fill it out

  1. Enter the project, area or room, partition type and the drawing references you are checking against.
  2. Check that all rough-in inspections for the area are complete and signed off before you start.
  3. Walk each wall and work down the checklist, marking each item as accepted or not accepted.
  4. Record deficiencies with a clear location and, where useful, a photo.
  5. Assign each deficiency to the responsible trade and re-inspect once it is fixed.
  6. Sign and date the checklist before you release the area for board installation.
  7. Repeat the post-installation checks once the drywall is hung.

What to look for before drywall

  • Framing layout, stud spacing and openings match the drawings
  • Walls are plumb and straight, with no bowed or damaged studs
  • Blocking is in place for cabinets, grab bars, handrails, TVs and wall-hung fixtures
  • Pipes, wiring and ducts are complete, secured and protected where they pass through studs
  • Insulation and any required fire or acoustic details are installed

Related templates and guides

Frequently asked questions

What do you look for at a pre-drywall inspection?

Check framing against the drawings, wall straightness, blocking for anything that will hang on the wall, and that plumbing, electrical and HVAC rough-ins are complete and protected. Confirm insulation and any fire or acoustic details are in place, and that nothing that should be inside the wall is missing.

When does a pre-drywall inspection happen?

After framing, rough-ins and insulation are finished and any required building department inspections for those stages have passed, but before drywall is delivered and hung. Book it close to board installation so nothing changes between the inspection and close-in.

Is a pre-drywall inspection the same as a framing inspection?

Not always. A framing inspection is usually carried out by the building department to check code compliance. A pre-drywall inspection is a quality check by the contractor, a consultant or a home inspector hired by the buyer. They happen at a similar stage but serve different purposes.

Who should do the pre-drywall walk-through?

On commercial work it is usually the drywall foreman or the general contractor’s superintendent or quality lead, sometimes with the consultant. On new homes, the builder’s supervisor often walks it with the buyer or the buyer’s inspector.

Can this checklist be used after the drywall is installed?

Yes. It covers checks before and after installation, so you can use it again once the board is hung to confirm the partition is complete before taping and finishing are signed off.

Reviews

There are no reviews yet

Be the first to review “QAQC Checklist – Drywall Partitions”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Quality

Site Setup Construction Checklist
Site Setup Construction Checklist
work permit - electrical isolation
Work Permit – Electrical Isolation
Material Submission Form
Material Submission Form
Quality Reinforcement Checklist – Reinforcement
LANDSCAPE design checklist
Landscape Design Quality Checklist

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
QAQC Checklist - Drywall Partitions
QAQC Checklist – Drywall Partitions
$4.99