Construction Operations Forms – Request For Concrete Pouring
$4.99
Use this template to manage the pours on your jobsite and ensure that all sign offs and inspections have been completed prior to concrete arriving on site.
LOVE THIS ITEM?
Download For Free
Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.
Start Your 14-Day Free TrialTemplates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.
Product FAQ
You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.
As long as the document remains on Essential Construction you will be able to download it once purchased.
Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.
We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.
Our return policy varies based on the product, for more information you can find our detailed return policy here.
Our documents are for use on your projects. You may not resell these documents on other marketplaces.
Full Description
This concrete pouring request form helps you manage every pour on your jobsite. Use it to confirm that all sign-offs and inspections are complete before concrete is ordered and arrives on site, and to get approval from the superintendent responsible for the work area.
What is a concrete pouring request form?
A concrete pouring request form, sometimes called a pour request or pour card, is the document a contractor submits to get permission to place concrete. It identifies the pour location and quantity, then records that formwork, reinforcement, embedded items and services have been inspected and approved. Only when the responsible people have signed it is the concrete ordered. It is a simple hold point that prevents concrete being placed over work that has not been checked.
When to use it
- Before every slab, wall, column or footing pour
- When a subcontractor is responsible for placing the concrete
- On projects with an inspection and test plan that sets a pour hold point
- When several trades must sign off embeds, sleeves and services
- Before booking pumps, trucks and testing for a large pour
What’s included
The form is a spreadsheet (.xls) built to manage pours on your jobsite. It is set up to record that all sign-offs and inspections are complete before concrete arrives on site, with approval from the superintendents responsible for the work areas.
How to fill it out
- Enter the project, the pour location (grid lines and level) and the element being poured.
- Record the planned date and time, the concrete mix or strength and the estimated volume.
- List the inspections needed, such as formwork, reinforcement, embeds and MEP sleeves, and attach the inspection records.
- Get each trade or inspector to sign off their items.
- Submit the request to the superintendent for the work area for approval.
- Only order concrete once the request is approved, and note the supplier, pump and testing arrangements.
- File the completed form with the pour records and test results.
Common mistakes to avoid
- Ordering concrete before the request is signed.
- Submitting the request too late for inspectors to attend.
- Forgetting embedded items, such as anchor bolts, sleeves and conduit.
- Not checking the weather forecast and protection needs for the pour.
Related templates and guides
- Concrete Pre-Pour Checklist Template
- Construction Operations Forms – Reinforcement Inspection Request Form
- Concrete Pouring Permit
- Work Permit – Concrete Pumping
- A Guide to Working With Concrete in Cold Weather
Frequently asked questions
What is a pour card in construction?
A pour card is another name for a concrete pour request or pour sign-off sheet. It travels with the pour and collects signatures from each trade and inspector to confirm their work is complete and checked before concrete is placed.
Who approves a concrete pouring request?
On most projects, the superintendent or site engineer responsible for the work area approves the request after the required inspections. Some projects also need sign-off from the engineer of record, a third-party inspector or the owner’s representative.
How far in advance should a pour request be submitted?
Follow your project specification or site procedure. The request needs to go in early enough for inspections to be booked and for the concrete supplier, pump and testing agency to be arranged, which on many sites means at least a day’s notice.
What should be checked before a concrete pour?
Typical checks include formwork alignment and bracing, reinforcement size, spacing and cover, embedded items and sleeves, cleanliness of the forms, access for trucks and pumps, weather protection and arrangements for testing.
What is the difference between a pour request and a pre-pour checklist?
A pre-pour checklist lists the detailed items to inspect. A pour request is the approval document that confirms those checks are complete and authorizes the pour. Many teams attach the checklist to the request.