Concrete Pouring Permit

$4.99

This concrete pouring permit can be used to ensure that all concreting works are done in accordance with the approved plans and specification.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
essentialvendor
Document Type
Spreadsheet
Language
N/A
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This concrete pouring permit is a pre-pour sign-off form that confirms a pour is ready to go before any concrete is placed. It helps make sure all concreting works are done in accordance with the approved plans and specifications, with rebar, formwork and the mix checked and signed off first.

What is a concrete pouring permit?

A concrete pouring permit, also called a pour permit, pour card or concrete pouring request, is a project form that must be completed and signed before a pour can start. The contractor requests the pour, and the engineer, inspector or quality lead checks that reinforcement, formwork, embedded items and the mix design comply with the approved drawings and specifications. Once everyone has signed, the pour is released. It is an internal quality control document, not a building department permit.

When to use it

  • Before every structural pour: footings, walls, columns, slabs, beams and stairs.
  • When the specification or quality plan requires engineer or inspector sign-off before concrete is placed.
  • When several trades have work cast into the concrete, such as sleeves, conduits and anchor bolts.
  • To give the batch plant and pump supplier a confirmed pour date and volume.
  • As a quality record for the project closeout file.

What’s included

The download is an Excel spreadsheet (.xlsx) set up as a concrete pouring permit. It is designed to confirm that the pour has been signed off, that rebar and formwork are installed properly and that mixes are checked before the pour begins, so concreting works follow the approved plans and specifications.

How to fill it out

  1. Enter the project, pour location, grid lines and level, and the element being poured.
  2. Add the planned pour date and time, estimated volume, mix design and supplier.
  3. Have the formwork checked for line, level, dimensions, bracing and cleanliness.
  4. Have the reinforcement checked for bar size, spacing, cover, laps and chairs against the approved drawings.
  5. Confirm embedded items from other trades are in place and signed off.
  6. Collect signatures from the contractor, the engineer or inspector and any trades required, then release the pour and file the permit.

Common mistakes to avoid

  • Booking the concrete truck before the permit is signed.
  • Skipping the trade sign-offs for sleeves and embeds, which are costly to fix after the pour.
  • Not recording the mix design and slump requirements, so the delivery tickets cannot be checked.
  • Leaving weather and curing arrangements off the checklist in hot or cold conditions.

Related templates and guides

Frequently asked questions

Is a concrete pouring permit the same as a building permit?

No. A building permit is issued by your local authority before construction starts and may require inspections. A concrete pouring permit is an internal project form that releases each pour once the formwork, rebar and embeds have been checked. Many projects need both.

Who signs a concrete pouring permit?

Typically the contractor’s superintendent or engineer requests the pour, and the structural engineer, owner’s inspector or quality manager signs once the checks pass. Trades with embedded work, such as electrical and plumbing, often sign too. Your specification or quality plan sets who must sign.

What is checked before a concrete pour?

Formwork dimensions, alignment, bracing and cleanliness; reinforcement size, spacing, cover and laps; embedded items, sleeves and anchor bolts; access, pump location and weather. The approved mix design, testing arrangements and curing plan should also be confirmed before the pour is released.

How far in advance should a pour be requested?

It depends on the project. Many specifications and inspectors ask for notice a day or more before the pour so inspections can be booked. Check your contract and local inspection requirements, and allow time to fix any items found during the pre-pour check.

What is the difference between a pour request and a pour permit?

On many projects they are the same form. Where they are separate, the pour request is the contractor’s notice that an element is ready, and the pour permit is the signed release that confirms the inspection passed and concrete can be placed.

SKU: FCQACPP Categories: , , Tags: , , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

Reviews

There are no reviews yet

Be the first to review “Concrete Pouring Permit”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Quality, Project Planning, Scheduling

Construction Preboard Checklist
Construction Pre-Board Checklist
Construction Operations Forms - Request for Baseboard Installation
Construction Operations Forms – Request for Baseboard Installation
Horizontal Formwork Productivity Monitoring Form
Contractors Daily Progress Report
RFI Log Template
Letter of Intent Template

More products by essentialvendor

Asphalt Paving Design Guide (Minnesota)
Asphalt Pavements Inspector’s Manual (State Of Alaska)
Formwork Health and Safety
Foundation Preparation, Removal of Water, Excavation
Competition’s Effect On Construction Bid Quality
Concrete Pouring Permit
$4.99