Construction Procurement Tracker

$4.99

Track your procurement schedule and when material will be on site.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
N/A
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This construction procurement log is a tracker for every material and piece of equipment you need to buy for the project. Knowing when material is scheduled to arrive on site helps keep the overall schedule on track, and this log puts submittal, order and delivery dates in one place.

What is a procurement log in construction?

A construction procurement log is a list of the materials and equipment a project must buy, with the key dates for each item as it moves from submittal to approval, order, fabrication and delivery. It shows which items are on time and which are at risk, especially long-lead items such as switchgear, elevators, curtain wall or structural steel. Project managers update it weekly and use it to chase suppliers before a late delivery delays the job.

When to use it

  • At project startup, to list every item that needs a submittal and a purchase order.
  • Weekly, to update submittal status, order dates and expected deliveries.
  • When planning long-lead items that must be ordered early to meet the schedule.
  • In coordination meetings with subcontractors and suppliers.
  • When a delivery slips and you need to see what work it affects.

What’s included

  • A line for each of the materials on your project.
  • When the submittal is completed.
  • When the product is released for order.
  • When it is expected on the jobsite.

The template is an Excel spreadsheet (.xlsx), so you can add columns for supplier, PO number or lead time as your project needs.

How to fill it out

  1. List every material and equipment item from the specifications and drawings, grouped by trade or spec section.
  2. Note the required-on-site date for each item from your construction schedule.
  3. Work backwards, allowing for delivery, fabrication and submittal review time, to find the latest date the submittal must be complete.
  4. Enter the actual date each submittal is completed and approved.
  5. Record the release-for-order date once the item is ordered.
  6. Update the expected delivery date as suppliers confirm, and flag any item that will arrive after it is needed.

Tips

  • Start with long-lead items. They decide whether the rest of the log matters.
  • Get lead times in writing from suppliers and recheck them when you order.
  • Review the log in every site meeting so late items are discussed while there is still time to act.

Related templates and guides

Frequently asked questions

What is the difference between a procurement log and a submittal log?

A submittal log tracks documents sent for approval, such as shop drawings and product data. A procurement log tracks the purchase itself, from approval to order to delivery. They overlap because an item usually cannot be ordered until its submittal is approved, so many teams track both together.

What are long-lead items in construction?

Long-lead items are materials or equipment that take weeks or months to fabricate and deliver, such as switchgear, generators, elevators, rooftop units, curtain wall and structural steel. They need to be identified early, submitted quickly and ordered as soon as they are approved.

How do you work out when to order material?

Start from the date the item is needed on site and work backwards. Subtract shipping time, fabrication or lead time, and the time needed to prepare and approve the submittal. The result is the latest date to start the submittal. Add a buffer for items with uncertain lead times.

Who maintains the procurement log?

On most jobs the general contractor’s project manager or project engineer owns the log, with input from subcontractors and suppliers. Subcontractors often keep their own procurement logs for their scope and report dates to the general contractor in coordination meetings.

What are procurement records?

Procurement records are the documents that show what was bought, from whom, at what price and when, such as purchase orders, quotes, approvals, delivery tickets and invoices. A procurement log is the summary that ties those records to the schedule.

SKU: FCPPPR3 Categories: , Tags: , , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

Reviews

There are no reviews yet

Be the first to review “Construction Procurement Tracker”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Scheduling, Project Planning

Water Shutoff Request Letter
Construction Project Quality Plan
Drywall Install Productivity Monitoring Form
General guide to traffic management
General Guide to Traffic Management
Construction Schedule – Two Storey House (Microsoft Project)

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
Construction Procurement Schedule
Construction Procurement Tracker
$4.99