Mockup

A mockup (or mock-up) is a full-size sample of a building element or assembly, built before the main work starts so the owner, consultants and

9460F518 3EDE 4F1F AB2E CFC9ACA6556A - Contingency

Contingency

Contingency is additional time or money allocated to a construction project in order to mitigate risk related to specific items. For example, one may carry

img 0791 - Gantt Chart

Gantt Chart

A Gantt chart is a bar chart that shows a project schedule against time. Project activities are listed down the left side (the Y-axis), the

work Breakdown structure w1500 - Work Break Down Structure

Work Break Down Structure [WBS]

A work breakdown structure (WBS) is a hierarchical breakdown of all the work in a project into smaller, manageable parts. In construction, think of it

Relationships (Schedule)

Relationships (also called dependencies or logic links) connect the activities in a schedule and define which work must happen before or after other work. Without

Liebherr 710 HC L with Fly Jib 2 1 - Luffing Crane

Luffing Crane

A luffing crane (or “luffer”) is a tower crane whose jib is pinned at its base and raised or lowered to change the hook’s reach.

Change Directive [CD]

A change directive is a written instruction, issued by the owner or by the consultant on the owner’s behalf, that directs the contractor to carry

CCN

A CCN (Contemplated Change Notice) is a formal contract document issued by the consultant, architect or owner asking the contractor to price a potential change

Change Order [CO]

In project management, a change order is a component of the change management process whereby changes in the scope of work agreed to by the