Our Material Submission Form is your first step towards impeccable project execution.

somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Sinan S. Celebci (FIDIC Engineer)
Document Type
Spreadsheet
Language
English
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This material submittal form is a spreadsheet for submitting proposed materials to the consultant or client for review and approval. It captures the material details, specifications and supplier information in one place, with a section for the project manager or supervisor to approve, so every material on the project is tracked and documented.

What is a material submittal?

A material submittal, also called a material submission or material approval request, is a package the contractor sends to the consultant, engineer or architect to show that a proposed material meets the project specifications before it is ordered or installed. It usually includes a cover form, product data sheets, test certificates and sometimes samples. The reviewer returns it marked approved, approved with comments, or revise and resubmit, which gives everyone a written record of what was accepted.

When to use it

  • Before ordering any material the specification says must be approved
  • When proposing an equal or alternative product to the one specified
  • Re-submitting a material after the consultant asked for changes
  • Supplying samples or mockup materials for approval
  • Building a record of approved materials for handover and closeout

What’s included

  • Material submission form in spreadsheet format (.xlsx)
  • Data entry fields for the proposed material, including type, specifications and supplier information
  • Integrated approval section for project managers and supervisors
  • Customizable layout you can adapt to your project’s requirements

How to fill it out

  1. Give the submittal a number and enter the project name, contract and date.
  2. Reference the specification section and drawing the material relates to.
  3. Describe the material: type, manufacturer, model or grade, and the supplier.
  4. Attach supporting documents such as data sheets, test reports, certificates and samples.
  5. State whether the material is as specified or a proposed alternative, and why.
  6. Sign as the contractor and send it to the reviewer, then record their decision and comments in the approval section.

Common mistakes to avoid

  • Ordering materials before the submittal is approved.
  • Sending incomplete data sheets that do not show the specified properties.
  • Proposing an alternative without explaining how it complies.
  • Not tracking submittals in a log, so approvals and resubmissions get lost.

Related templates and guides

Frequently asked questions

What is the difference between a submission and a submittal?

In construction they usually mean the same thing. Submittal is the common term in North America, while submission is widely used in the Middle East, Asia and other regions. Both describe documents or samples sent to the design team for review and approval.

What does a material submittal include?

A cover form with the project, specification reference and material details, plus supporting documents such as manufacturer data sheets, test reports, certificates of compliance, warranties and samples where required. The specification usually lists what each material submittal must contain.

Who approves a material submittal?

The architect, engineer or consultant named in the contract reviews the submittal against the specifications. On many projects the contractor’s own project manager or quality lead reviews it first, before it goes to the consultant for formal approval.

What do submittal review statuses mean?

Common statuses are approved, approved with comments or as noted, revise and resubmit, and rejected. Approved with comments means you can proceed but must follow the notes. Revise and resubmit means the material cannot be used until a corrected submittal is approved.

What is a material approval request?

A material approval request is another name for a material submittal. The contractor asks the consultant to approve a specific material before buying or installing it, so the project has a written record that the material meets the specification.

SKU: 20240420A Categories: , Tags: , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

Reviews

There are no reviews yet

Be the first to review “Material Submission Form”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Administration, Quality

QAQC Checklist - Surveying
Surveying Quality Checklist
Example Project Filing Procedures
Quality checklist - foundations
Foundations Quality Checklist
Confirmation of Verbal Instruction
Confirmation of Verbal Instruction
Construction Operations Forms – Request for Painting

More products by Sinan S. Celebci (FIDIC Engineer)

Request for Inspection
Request for Inspection
TDDR _ Transmital of Drawings /Documents/Reports
Request For Clarification
Non Conformity Reporting
Material Submission Form
Material Submission Form
Material Submission Form
Material Submission Form
$6.00