Request for Inspection
$5.00
The ‘Request for Inspection’ (RFI) form is a pivotal resource for contractors and engineers, facilitating thorough and timely inspections and ensuring every phase of your project meets the strictest quality standards.
LOVE THIS ITEM?
Download For Free
Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.
Start Your 14-Day Free TrialTemplates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.
Product FAQ
You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.
As long as the document remains on Essential Construction you will be able to download it once purchased.
Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.
We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.
Our return policy varies based on the product, for more information you can find our detailed return policy here.
Our documents are for use on your projects. You may not resell these documents on other marketplaces.
Full Description
This request for inspection form lets contractors ask the engineer or consultant to inspect completed work before the next stage starts. It helps you book inspections on time, record the results and keep a clear audit trail of quality checks at every phase of the project.
What is a request for inspection (RFI) in construction?
A request for inspection, often shortened to RFI or IR, is a form the contractor submits to the engineer, consultant or client’s representative asking them to inspect a specific piece of work. It states what is ready, where it is and when the inspection is needed. The inspector records the result, comments and approval, and both parties sign. Approved requests are usually needed before work is covered up or the next activity begins, such as pouring concrete over reinforcement.
When to use it
- Before covering work, such as reinforcement before a concrete pour
- At hold points in an inspection and test plan
- When a work area or stage is complete and ready for sign-off
- When re-inspection is needed after defects have been fixed
- To build a documented quality record for handover and audits
What’s included
This form is a spreadsheet (.xlsx) that includes:
- Categorized sections for the inspection request, including the nature and area of application
- Submission guidance requiring requests by 14:00 the day before the planned inspection
- Fields for the purpose of the inspection, the location and any details or explanations that may affect it
- Space for inspection results, comments and the engineer’s feedback
- Signatures from the requesting party and the engineer to acknowledge the request and the outcome
How to fill it out
- Check the work is complete and ready, and that your own internal checks are done.
- Fill in the nature of the work, the area of application and the location.
- State the purpose of the inspection and add any details the inspector needs to know.
- Submit the form by 14:00 on the day before the planned inspection.
- Attend the inspection with the engineer and walk the work together.
- Record the result and comments, and get both signatures.
- If work is rejected, fix the defects and submit a new request for re-inspection.
Tips
- Number every request and keep a log, so you can match results to locations later.
- Attach the drawing reference or marked-up sketch so the inspector checks the right area.
- Do not cover work until the request is signed off.
- Plan requests in your lookahead so inspections do not hold up the next trade.
Related templates and guides
- Reinforcement Inspection Request Form
- Construction Operations Forms – Request For Concrete Pouring
- Site Instruction Form
- Controlling Quality on the Construction Site
- All inspection templates
Frequently asked questions
What does RFI stand for in construction inspections?
In quality and inspection work, RFI usually means request for inspection. It is a different document from a request for information, which asks the design team a question. Because both use the same initials, many projects label inspection requests IR or RFIn to avoid confusion.
What is the difference between a request for inspection and a request for information?
A request for inspection asks the engineer or consultant to check completed work and approve it before the next stage. A request for information asks the design team to clarify drawings, specifications or contract documents. One is about checking work; the other is about getting answers.
When should a request for inspection be submitted?
Submit it once the work is complete and your own checks are done, early enough for the inspector to plan their visit. This form asks for requests by 14:00 the day before the inspection. Your contract or quality plan may set a different notice period.
What happens if an inspection fails?
The inspector records the defects and comments on the form. The contractor fixes the work and submits a new request for re-inspection. The work should not be covered up or built over until it has been approved.
Who signs a request for inspection?
The contractor’s representative who raises the request signs it, and the engineer or consultant who carries out the inspection signs to record the result. Both signatures show the request was made and the outcome was acknowledged.
Ask AI about this template: ChatGPT, Claude or Perplexity·Copy as Markdown
1 review for Request for Inspection
This site uses Akismet to reduce spam. Learn how your comment data is processed.










ARNEL CORPUZ –
I can see that this RFI is limited to a specific discipline and work package. It is recommended to issue a general RFI covering common or recurring concerns, to avoid creating multiple RFIs for similar work activities in the future. This will improve coordination, documentation control, and overall efficiency.