Three Week Look Ahead Schedule Template

5.00 out of 5
(1 customer review)

$0.00

  • Keep track and forecast progress on site
  • Communicate short term look aheads to stakeholders
  • Save time creating your own spreadsheet
  • Absolutely free

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Download FREE!

To download Three Week Look Ahead Schedule Template today just enter your email address!

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
N/A
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This 3 week look ahead template is a free Excel spreadsheet for planning and communicating the next three weeks of work on a construction project. Regular look-ahead updates keep your trades, the general contractor and the owner working from the same short-term plan, and save you the time of building your own schedule sheet.

What is a 3 week look ahead schedule?

A 3 week look ahead schedule is a short-term construction schedule that breaks the next three weeks of the master schedule into specific activities, by trade and by day. It shows what work will happen, where and who is doing it, so crews, materials, equipment and inspections can be lined up in advance. It is usually updated every week, rolling forward one week each time, and reviewed at the foremen’s or coordination meeting.

When to use it

  • Weekly foremen’s or subcontractor coordination meetings
  • Forecasting progress on site and spotting conflicts between trades
  • Planning deliveries, crane time, inspections and shutdowns
  • Communicating short-term plans to the owner, consultants and head office
  • Recovering from a delay, when the master schedule is too high-level to guide daily work

What’s included

The download is an Excel spreadsheet (.xlsx). Features include:

  • Activity name column
  • Trade name column
  • The ability to change the date and day of the week in a column
  • Conditional formatting that makes changing colors and picking dates on the schedule easier
  • Repeating print styles, with page numbers and a repeating date row
  • Formatting that extends beyond three weeks, so you can use it as a six week look ahead if you are comfortable in Excel

How to fill it out

  1. Set the start date for the first week. Most teams start on the Monday of the coming week.
  2. Pull the activities for the next three weeks from the master schedule.
  3. Break each one into tasks a foreman would recognize, such as “Level 2 east walls, frame”.
  4. Enter the trade responsible for each activity.
  5. Mark the days each activity will be worked, using the formatting to color the bars.
  6. Review the draft with each trade foreman and adjust for crew size, deliveries and constraints.
  7. Print or share it before the coordination meeting, then roll it forward one week every week.

Tips

  • Have foremen commit to the activities they own. A look ahead the trades did not help build is rarely followed.
  • Note constraints next to activities: drawings, approvals, materials and access.
  • Compare last week’s plan with what actually happened and talk about the misses.
  • Feed what you learn from the look ahead back into the master schedule.

Related templates and guides

Frequently asked questions

What is commonly included in a three-week look ahead?

Activities for the next three weeks, the trade or crew responsible, the location or area, and the days each activity will be worked. Many teams also add constraints such as materials, approvals and inspections, plus key deliveries and milestones from the master schedule.

How often should a 3 week look ahead be updated?

Weekly. Each week the schedule rolls forward: the week just finished drops off, the next two weeks are refined, and a new third week is added. Updating it before the weekly coordination meeting keeps it current.

Should I use a 2, 3 or 6 week look ahead?

Three weeks is a common balance: far enough ahead to order materials and book inspections, close enough to plan with confidence. Fast jobs may use two weeks. Longer lead items often call for a six week look ahead, which this template can be extended to.

How is a look ahead different from the master schedule?

The master schedule covers the whole project at a summary level. The look ahead zooms into the next few weeks with day-by-day tasks by trade. It is the working plan the field uses, while the master schedule tracks overall dates and the critical path.

Can I use this template in Google Sheets?

The file is an Excel spreadsheet. You can upload it to other spreadsheet programs, but conditional formatting and print settings may not behave exactly the same, so check the layout after converting.

1 review for Three Week Look Ahead Schedule Template

5.0
Based on 1 review
5
100
100%
4
0%
3
0%
2
0%
1
0%
  1. 5 out of 5

    Moustapha Mahamad –

    Tres important

Add a review

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Scheduling, Free, Quality

Quantity Takeoff Quality Checklist
First Aid Station Construction Checklist
Request for inspection
Request for inspection
P.E.R.T. Schedule Analysis
Floor Tiling Productivity Monitoring Form

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block