Weekly Lookahead Planner

$6.99

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
N/A
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This weekly lookahead planner gives your team a 2 week look ahead schedule and a longer 5–6 week view in one place. List the key tasks, who is responsible for each and the resources needed, so the crew knows what is coming and problems surface before they reach the field.

What is a look ahead schedule?

A look ahead schedule is a short-term plan that breaks the next few weeks of the master schedule into specific tasks for the field. Common windows are two, three or six weeks. It shows what will be done, by whom and what each task needs, such as materials, equipment, labor, permits or inspections. Superintendents and foremen update it every week so constraints are cleared before work is due to start.

When to use it

  • Weekly site coordination meetings with trades and foremen
  • Planning deliveries, crane time and labor for the next two weeks
  • Spotting tasks that are waiting on drawings, RFIs, permits or approvals
  • Communicating the short-term plan to the owner or project team
  • Recovering schedule after a delay by re-sequencing upcoming work

What’s included

This planner is a spreadsheet (.xlsx) that lets your team look ahead both short term (1–2 weeks) and longer term (5–6 weeks). It provides room to list:

  • Key tasks
  • Who is responsible for each task
  • The resources your team will need to complete them

How to fill it out

  1. Pull the next six weeks of activities from your master schedule.
  2. Break the next two weeks into specific, field-level tasks.
  3. Assign a responsible person or trade to each task.
  4. List the resources each task needs: crew, materials, equipment and approvals.
  5. Review open constraints, such as RFIs and deliveries, and assign someone to clear each one.
  6. Share the planner at the weekly meeting and update it every week.

Tips

  • Keep the two-week window detailed and the longer window high level.
  • Get foremen to commit to their tasks. Plans they help build are more realistic.
  • Compare last week’s plan with what was actually done, and note why tasks slipped.
  • Keep the lookahead tied to the master schedule so delays show up in both.

Related templates and guides

Frequently asked questions

What is a 2 week look ahead in construction?

It is a detailed plan of the work scheduled for the next two weeks, broken into field-level tasks with the responsible trade and the resources needed. It is usually reviewed at the weekly coordination meeting and rolled forward one week at a time.

What is a 3 week look ahead in construction?

It is the same idea over a three-week window. A longer window gives more time to clear constraints such as material deliveries, permits and RFIs, while still being short enough to plan in detail. Teams pick the window that suits their project.

How is a look ahead schedule different from the master schedule?

The master schedule covers the whole project at activity level. The look ahead takes the next few weeks of that schedule and breaks it into specific tasks, people and resources so the field can execute it. The master sets the target; the look ahead plans how to hit it.

Who prepares the look ahead schedule?

Usually the superintendent or site manager, with input from foremen and trade contractors. The project scheduler checks it stays consistent with the master schedule. Involving the people doing the work makes the plan more reliable.

How often should a look ahead schedule be updated?

Update it every week, normally before the weekly site coordination meeting. Each update rolls the window forward, records what was completed, notes why any tasks slipped and adds the next week of work.

SKU: FCSCWLP Categories: , Tags: , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

Reviews

There are no reviews yet

Be the first to review “Weekly Lookahead Planner”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Scheduling, Reporting

Drywall Install Productivity Monitoring Form
Construction Weekly Status Report
Weekly Status Report Template
Construction project startup checklist template
Construction Startup Checklist
Mock-up Schedule
Mockup Schedule
Weekly Progress Report – Bridge And Approach Slab

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
Weekly Lookahead Planner
Weekly Lookahead Planner
$6.99