Use this wood door quality control checklist to check for items both before and after installation.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Kyle Parry
Document Type
Spreadsheet
Language
English
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This wood door inspection checklist helps you control quality on every wood door your team installs. Use it to check items before the doors go in and again once they are hung, so damage, poor fit and missing hardware are caught before handover.

What is a door inspection checklist?

A door inspection checklist is a quality control form used to confirm that doors are supplied and installed to the drawings, door schedule and specifications. For wood doors, it covers the condition of the door leaf as delivered, storage and handling, and the finished installation. Each item is marked acceptable or not, and any defects are recorded for correction. It is different from a periodic fire door inspection, which checks doors that are already in service.

When to use it

  • When wood doors are delivered, before they are accepted on site
  • Before installation starts in each area, to confirm frames and openings are ready
  • After doors are hung and hardware is fitted
  • During punch list walks before handover
  • When a new door installer or finish carpentry crew starts

What’s included

The download is an Excel spreadsheet (.xlsx) quality control checklist for wood door installation. It includes more than 10 items to check, covering both pre-installation and post-installation checks. A predefined list like this can be standardized across your project so every supervisor checks the same items.

How to fill it out

  1. Enter the project, floor, room and door number from the door schedule.
  2. On delivery, check door type, size, core, veneer or finish, and any fire label against the schedule.
  3. Inspect each leaf for warping, dents, scratches, delamination and unsealed edges.
  4. Before hanging, confirm the frame is plumb, square and secure and the opening is clean.
  5. After hanging, check gaps and clearances, swing, latching and that the door closes without binding.
  6. Check hardware is complete, fixed and working, and the finish is undamaged.
  7. Record defects and the responsible party, then re-inspect and sign off.

Common mistakes to avoid

  • Storing wood doors where they can get wet or are exposed to large swings in humidity.
  • Cutting or planing a door edge without resealing it as the manufacturer requires.
  • Hanging doors before wet trades and painting are finished nearby.
  • Signing off doors without operating them through a full swing.

Related templates and guides

Frequently asked questions

Is this a fire door inspection checklist?

No. This is a construction quality control checklist for installing wood doors. Fire-rated door assemblies in service usually need periodic inspection to the fire code that applies in your area, using a dedicated fire door inspection form. You can still use this checklist to confirm labeled doors are installed as specified.

What should you check when wood doors are delivered?

Check each door against the door schedule for type, size, handing, core, finish and any label. Look for warping, dents, scratches, veneer damage and unsealed edges. Record damage on the delivery ticket and reject or tag doors that do not meet the specification.

What are common wood door installation defects?

Typical defects include uneven gaps around the leaf, doors that bind or will not latch, warped leaves, damaged veneer or finish, missing or loose hardware, and edges that were trimmed and not resealed.

Who should complete the door inspection checklist?

Usually the finish carpentry or door installation foreman checks the work first, then the general contractor’s superintendent or QA/QC inspector verifies and signs off. On some projects the architect or owner’s representative also reviews door installation during punch list walks.

SKU: 2021123B Category: Tags: , , , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

Reviews

There are no reviews yet

Be the first to review “QAQC Checklist – Wood Doors”

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Quality

Quality Assurance Checklist – Masonry Works
Notice To Comply Form
Concrete Pre-Pour Checklist (Verticals)
Concrete Pre-Pour Checklist (Verticals)
Work Permit - Scaffolding (Critical Work)
Work Permit – Scaffolding (Critical Work)
Material Approval Form – Register

More products by Kyle Parry

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
QAQC Checklist – Wood Doors
$4.99