Use this log to keep track of the RFIs on your project.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Templates are starting points. Adapt them to your contract and to the laws and safety rules where you work. They are not legal advice.

Contributor
Willie Strydom
Document Type
Spreadsheet
Language
N/A
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

This RFI log is a tracking sheet for every request for information on your project. RFIs add up quickly, and without a log they get lost, answers arrive late and work stalls. Use it to see what is open, who has the ball and which questions are critical.

What is an RFI log?

An RFI log, also called an RFI register or tracker, is a running list of all requests for information issued on a construction project. Each row records the RFI number, subject, priority, dates and the party responsible for answering. The log shows at a glance which RFIs are still open, how long they have been outstanding and which ones could hold up the schedule. Project managers use it to chase responses and to report RFI status at project meetings.

When to use it

  • From the first RFI on the project, so numbering stays consistent
  • At weekly coordination meetings, to review open and overdue RFIs
  • When reporting to the owner or design team on outstanding questions
  • When a delay or change order needs a record of when a question was asked and answered
  • At closeout, to confirm every RFI has been answered and filed

What’s included

The RFI log is a spreadsheet that tracks:

  • RFI number
  • Criticalness (priority)
  • Date tracking
  • Subject
  • Responsible party or ball in court (BIC)
  • Date returned to the contractor
  • A summary of how many RFIs each party has in their court
  • A summary of upcoming critical RFIs and outstanding RFIs

How to fill it out

  1. Give each new RFI the next number in sequence and never reuse numbers.
  2. Enter a short subject so the RFI is easy to find later.
  3. Set the criticalness based on how soon the answer affects work on site.
  4. Record the date sent and the party responsible for the answer.
  5. Update the ball in court each time the RFI moves between parties.
  6. Enter the date the answer is returned, then close the item.
  7. Review the summary before each meeting to chase critical and overdue RFIs.

Tips

  • Keep one log per project and one owner for it.
  • Ask one question per RFI. Combined questions are slower to answer and harder to track.
  • Flag RFIs that could lead to a change in cost or time, and link them to your change process.
  • File each answered RFI with its response so the log and the documents match.

Related templates and guides

Frequently asked questions

What is the purpose of an RFI in construction?

An RFI asks the design team or owner to clarify something in the drawings, specifications or contract that is unclear, missing or conflicting. It creates a written question and a written answer, so work proceeds on agreed information and there is a record if the answer changes cost or time.

What should an RFI log include?

At minimum: RFI number, subject, priority, date sent, who is responsible for the answer, date due and date answered. A summary of open and critical RFIs by party helps you see where answers are stuck and who to chase.

What does ball in court mean on an RFI log?

Ball in court, or BIC, shows which party currently needs to act on the RFI, such as the architect, engineer, owner or contractor. Updating it each time the RFI moves makes it clear who is holding things up.

How do you respond to an RFI?

Read the question, check the relevant drawings and specifications, and give a clear written answer with any sketches or references needed. If the answer changes the scope, say so, so the contractor can raise a change request. Return it within the time set in the contract or project procedures.

What is the difference between an RFI log and an RFI form?

The RFI form is the single document used to ask one question. The RFI log is the register that tracks every RFI on the project and its status. You need both: the form to ask, and the log to manage.

SKU: 20220620A Categories: , Tags: , , ,

Ask AI about this template: ChatGPT, Claude or PerplexityCopy as Markdown

1 review for RFI Log sheet

5.0
Based on 1 review
5
100
100%
4
0%
3
0%
2
0%
1
0%
  1. 5 out of 5

    Jose Paolo Aguado –

    Great Stuff!

Add a review

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Administration, Construction

Validation Letter for Variation Orders
Schedule reliability analysis
Schedule Reliability Analysis
Construction project task manager
Project Task Manager
Change Order Log
Construction Quote Cover Letter
Construction Quote Cover Letter Template

More products by Willie Strydom

rfi log
RFI Log sheet
rfi log
RFI Log sheet
$4.99