Construction Schedule – Mid Rise Residential Building

4.00 out of 5
(1 customer review)

$12.99

Save time with this ready made mid-rise residential tower construction project schedule for use with Microsoft Project.

LOVE THIS ITEM?

Download For Free

Subscribe to download this item for free! You'll unlock unlimited access to thousands of construction documents, templates and tutorials.

Start Your 14-Day Free Trial
somdn_product_page

Contributor
builderkp
Document Type
Microsoft Project
Language
English
By downloading this product you are agreeing to our terms and conditions.

Product FAQ

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

In construction there are four main requirements for a successful project. Hitting your schedule, being on or under budget, delivering high quality while maintain a safe worksite. This ready made project schedule for a mid-rise residential tower is designed to make the first of those requirements easy for you.

What is a project schedule?
A project schedule is a documents which identifies the various activities of a construction project, sequencing them and assigning them timelines to define the overall timeframe of a pro

What is included in this project schedule?
This project schedule is prepared for a mid-rise residential tower (13 storeys). It features all 16 divisions with over 250+ activities from site preparation and excavation through to finishes, mechanical and electrical activities as well as closeout and deficiencies.

What do I need to know about this project schedule?
All relationships are in place and each activity has a standard duration of 5 days. You can customize this by editing each of the durations of the activities and adding additional activities in for your project as is needed. This schedule is generated in Microsoft Project.

Why should I download this project schedule?
Generating the base structure of a schedule takes time. By having this pre-built and ready for every project you can generate a project schedule faster, saving you time and money allowing you to focus on other things.

  • 250+ activitities
  • Standard duration allowing you to easily customize
  • Work break down structure prepared
  • Formatted professionally
  • Microsoft Project ready

Start saving time on your project with this mid-rise residential Microsoft Project construction schedule.

1 review for Construction Schedule – Mid Rise Residential Building

4.0
Based on 1 review
5
0%
4
100
100%
3
0%
2
0%
1
0%
  1. 4 out of 5

    Jemell A. Kiazolu –

    This is good

Add a review

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More like this: Scheduling, Construction

Mockup Schedule Template
Excavation – Code Of Practice
QAQC Checklist – Demolition Work (Structural Removals)
Construction Work – Code Of Practice
Construction safety meeting - respiratory protection
Weekly Safety Meeting – Respiratory Protection

More products by builderkp

Confined Space Construction Checklist
Demolition Safety Checklist
Single Bed (Plan View) – Autocad Block
Dining Room Table (Plan View) – Autocad Block
North Arrow – Autocad Block
Construction Schedule – Mid Rise Residential Building
$12.99